Nuclear reactors supplied by China First Heavy Industries
China First Heavy Industries is recorded as the nuclear steam supply system (NSSS) supplier of 31 units in 1 country, per the IAEA PRIS register: 16 operating with 16,672 MWe net and 15 under construction.
Maker of reactor vessels and heavy nuclear-island components for China's recent fleet. By country: China (31). By technology: 31 PWR. The first unit was connected in 2013 and the most recent in 2026. The most powerful unit in operation is Cangnan San'ao 1-1, in China, with 1,208 MWe. 15 units are under construction: Cangnan San'ao 1-2 (China), Changjiang 4 (China), Linglong 1 (China) and Lufeng 5 (China) and others.
PRIS supplier codes: CFHI · Reference · Names per IAEA, Nuclear Power Reactors in the World 2025, table 25
Units with a China First Heavy Industries nuclear steam supply system
| Unit | Country | Type | Model | MWe | Grid connection | Status |
|---|---|---|---|---|---|---|
| Yangjiang 1 | PWR | CPR-1000 | 1,000 | 2013 | Operating | |
| Ningde 1-3 | PWR | CPR-1000 | 1,018 | 2015 | Operating | |
| Yangjiang 2 | PWR | CPR-1000 | 1,000 | 2015 | Operating | |
| Yangjiang 3 | PWR | CPR-1000 | 1,000 | 2015 | Operating | |
| Ningde 1-4 | PWR | CPR-1000 | 1,018 | 2016 | Operating | |
| Yangjiang 4 | PWR | CPR-1000 | 1,000 | 2017 | Operating | |
| Yangjiang 5 | PWR | ACPR-1000 | 1,000 | 2018 | Operating | |
| Yangjiang 6 | PWR | ACPR-1000 | 1,000 | 2019 | Operating | |
| Tianwan 3-6 | PWR | CNP-1000 (CNNC) (CNP-1000) | 1,060 | 2021 | Operating | |
| Fangchenggang 2-3 | PWR | Hualong One (HPR1000) | 1,000 | 2023 | Operating | |
| Fangchenggang 2-4 | PWR | Hualong One (HPR1000) | 1,000 | 2024 | Operating | |
| Zhangzhou 1-1 | PWR | Hualong One (HPR1000) | 1,126 | 2024 | Operating | |
| Zhangzhou 1-2 | PWR | Hualong One (HPR1000) | 1,126 | 2025 | Operating | |
| Cangnan San'ao 1-1 | PWR | Hualong One (HPR1000) | 1,208 | 2026 | Operating | |
| Cangnan San'ao 1-2 | PWR | Hualong One (HPR1000) | 1,117 | 2026 | Under construction | |
| Changjiang 3 | PWR | Hualong One (HPR1000) | 1,000 | 2026 | Operating | |
| Changjiang 4 | PWR | Hualong One (HPR1000) | 1,000 | 2026 | Under construction | |
| Linglong 1 | PWR | Linglong One (ACP100) | 100 | 2026 | Under construction | |
| Taipingling 1-2 | PWR | Hualong One (HPR1000) | 1,116 | 2026 | Operating | |
| Lufeng 5 | PWR | Hualong One (HPR1000) | 1,116 | 2028 | Under construction | |
| Taipingling 2-3 | PWR | Hualong One (HPR1000) | 1,209 | 2028 | Under construction | |
| Zhangzhou 2-3 | PWR | Hualong One (HPR1000) | 1,129 | 2028 | Under construction | |
| Shidao Bay 3-1 | PWR | Hualong One (HPR1000) | 1,134 | 2029 | Under construction | |
| Shidao Bay 3-2 | PWR | Hualong One (HPR1000) | 1,134 | 2029 | Under construction | |
| Zhangzhou 2-4 | PWR | Hualong One (HPR1000) | 1,129 | 2029 | Under construction | |
| Cangnan San'ao 2-3 | PWR | Hualong One (HPR1000) | 1,208 | — | Under construction | |
| Jiangsu Xuwei 1-1 | PWR | Hualong One (HPR1000) | 729 | — | Under construction | |
| Lianjiang 1-2 | PWR | CAP1000 | 1,224 | — | Under construction | |
| Lufeng 1 | PWR | CAP1000 | 1,250 | — | Under construction | |
| Ningde 2-5 | PWR | Hualong One (HPR1000) | 1,200 | — | Under construction | |
| Zhaoyuan 1-1 | PWR | Hualong One (HPR1000) | 1,117 | — | Under construction |
Data: Global Energy Monitor (CC BY 4.0), IAEA PRIS 2025, Wikipedia (CC BY-SA), Wikidata and Wikimedia Commons. Capacities in net MWe unless stated.
Other vendors
Westinghouse · Framatome · General Electric · Rosatom (Atomenergomash, Atomstroyexport) · Atomenergoexport (USSR) · Siemens / Kraftwerk Union · Nuclear Power Corporation of India · Atomic Energy of Canada Limited · Vendors