Linglong
Linglong, nuclear power plant under construction in China, will add one pressurized water reactor with 100 MW net projected capacity.
Linglong 1 is under construction, with grid connection expected in 2026.
- Country
- China
- Units
- 1
- Technology
- PWR
- Net capacity
- —
- First grid connection
- 2026
- Operator
- CNNC Hainan Nuclear Power
- Owner
- China National Nuclear Power Co Ltd
- Status
- Under construction
See also: alerts for this plant · every plant in China · Vendor: China First Heavy Industries · every PWR reactor · how a PWR works
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2026
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Linglong 1 | Pressurized water (PWR) | Linglong One (ACP100) | Under construction | 100 | 385 | Jul 2021 | 2026 (planned) | — | — |
Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026
Linglong 1, a 100 MWe PWR (Linglong One (ACP100)), has been under construction since 2021, with grid connection expected in 2026.
Operator: CNNC Hainan Nuclear Power.