🇨🇳 China · 23.825, 117.473
Zhangzhou
4 reactors PWR, in service since 2025. Today it delivers 1,126 MWe net, enough for about 3,546,900 households.
Operating capacity
1,126 MWe
net electrical
Units
4
1 operating
First start-up
2025

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Zhangzhou 3 | Pressurized water (PWR) | Hualong One | Under construction | 1,129 | 3,180 | Feb 2024 | 2028 (planned) | — | — |
| Zhangzhou 4 | Pressurized water (PWR) | Hualong One | Under construction | 1,129 | 3,180 | Sep 2024 | 2029 (planned) | — | — |
| Zhangzhou 1-1 | Pressurized water (PWR) | HPR1000 | Operating | 1,126 | 3,190 | Oct 16, 2019 | Nov 28, 2024 | — | — |
| Zhangzhou 1-2 | Pressurized water (PWR) | HPR1000 | Under construction | 1,126 | 3,190 | Sep 2020 | 2025 (planned) | — | — |
Operator: CNNC Zhangzhou Energy CO LTD.
Owner: China National Nuclear Power CO LTD [51%]; National Energy Investment Group CO LTD [49%] (Zhangzhou 3, Zhangzhou 4, Zhangzhou 1-1, Zhangzhou 1-2).