🇨🇳 China · 27.196, 120.519

Cangnan San'ao

2 reactors PWR, in service since 2026.

Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
2026

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Cangnan San'ao 1-1Pressurized water (PWR)HRP1000Under construction1,1173,180Dec 20202026 (planned)
Cangnan San'ao 1-2Pressurized water (PWR)HRP1000Under construction1,1173,180Dec 20212027 (planned)

Operator: CGN Cangnan Nuclear Power CO LTD.

Owner: China General Nuclear Power Group CO LTD [51%]; Shenergy CO LTD [20%]; Anhui Wanneng CO LTD [15%]; Shanghai Power CO LTD [14%] (Cangnan San'ao 1-1, Cangnan San'ao 1-2).

More information