🇨🇳 China · 21.709, 112.261

Yangjiang

6 reactors PWR, in service since 2014. Today it delivers 6,000 MWe net, enough for about 18,900,000 households.

Operating capacity
6,000 MWe
net electrical
Units
6
6 operating
First start-up
2014
Yangjiang
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Yangjiang 1Pressurized water (PWR)CPR-1000Operating1,0002,905Dec 16, 2008Dec 31, 201388.8 % (2024)
Yangjiang 2Pressurized water (PWR)CPR-1000Operating1,0002,905Jun 4, 2009Mar 10, 2015100.2 % (2024)
Yangjiang 3Pressurized water (PWR)CPR-1000Operating1,0002,905Nov 15, 2010Oct 18, 201592.8 % (2024)
Yangjiang 4Pressurized water (PWR)CPR-1000Operating1,0002,905Nov 17, 2012Jan 8, 201792.8 % (2024)
Yangjiang 5Pressurized water (PWR)ACPR-1000Operating1,0002,905Sep 18, 2013May 23, 2018102.3 % (2024)
Yangjiang 6Pressurized water (PWR)ACPR-1000Operating1,0002,905Dec 23, 2013Jun 29, 201993.1 % (2024)

Operator: Yangjiang Nuclear Power CO LTD.

Owner: China General Nuclear Power CO LTD [34%]; Guangdong Nuclear Power Investment CO LTD [25%]; CLP Nuclear Power (Yangjiang) CO LTD [17%]; Guangdong Energy Group CO LTD [17%]; CGN Phase I Industrial Investment Fund CO LTD [7%] (Yangjiang 1, Yangjiang 2, Yangjiang 3, Yangjiang 4, Yangjiang 5, Yangjiang 6).

More information