🇨🇳 China · 21.577, 108.480
Fangchenggang
4 reactors PWR, in service since 2016. Today it delivers 4,000 MWe net, enough for about 12,600,000 households.
Operating capacity
4,000 MWe
net electrical
Units
4
4 operating
First start-up
2016
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Fangchenggang 1-1 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Jul 30, 2010 | Oct 25, 2015 | — | 86.9 % (2024) |
| Fangchenggang 1-2 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Dec 23, 2010 | Jul 15, 2016 | — | 92.2 % (2024) |
| Fangchenggang 2-3 | Pressurized water (PWR) | HPR1000 | Operating | 1,000 | 3,150 | Dec 24, 2015 | Jan 10, 2023 | — | 78.0 % (2024) |
| Fangchenggang 2-4 | Pressurized water (PWR) | HPR1000 | Operating | 1,000 | 3,150 | Dec 23, 2016 | Apr 9, 2024 | — | 98.1 % (2024) |
Operator: Guangxi Fangchenggang Nuclear Power CO LTD.
Owner: Guangxi Fangchenggang CGN Nuclear Power Industry Investment CO LTD [61%]; Guangxi Guangtou Energy Group CO LTD [39%] (Fangchenggang 1-1, Fangchenggang 1-2, Fangchenggang 2-3, Fangchenggang 2-4).