🇨🇳 China · 22.818, 115.831

Lufeng

One reactor PWR, in service since 2028.

Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2028

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Lufeng 5Pressurized water (PWR)Hualong OneUnder construction1,1163,180Sep 20222028 (planned)

Operator: CGN Lufeng Nuclear Power CO LTD.

Owner: CGN Power CO LTD.

More information