🇨🇳 China · 36.979, 122.532
Shidao Bay
3 reactors HTGR · PWR, in service since 2023. Today it delivers 150 MWe net, enough for about 472,500 households.
Operating capacity
150 MWe
net electrical
Units
3
1 operating
First start-up
2023
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Shidao Bay 1 | High-temperature gas (HTGR) | HTR-PM | Operating | 150 | 500 | Dec 9, 2012 | Dec 14, 2021 | — | 20.7 % (2024) |
| Shidao Bay 2-1 | Pressurized water (PWR) | — | Under construction | 1,534 | — | — | 2023 (planned) | — | — |
| Shidao Bay 2-2 | Pressurized water (PWR) | — | Under construction | 1,534 | — | — | 2024 (planned) | — | — |
Operator: Huaneng Shandong Shidao Bay Nuclear Power CO LTD (Shidao Bay 1) · State Nuclear Power Demonstration Plant CO LTD (Shidao Bay 2-1, Shidao Bay 2-2).
Owner: China Huaneng Group (Shidao Bay 1) · State Nuclear Power Technology CO LTD [75%]; Huaneng Nuclear Power Development CO LTD [25%] (Shidao Bay 2-1, Shidao Bay 2-2).