🇨🇳 China · 36.979, 122.532

Shidao Bay

3 reactors HTGR · PWR, in service since 2023. Today it delivers 150 MWe net, enough for about 472,500 households.

Operating capacity
150 MWe
net electrical
Units
3
1 operating
First start-up
2023

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Shidao Bay 1High-temperature gas (HTGR)HTR-PMOperating150500Dec 9, 2012Dec 14, 202120.7 % (2024)
Shidao Bay 2-1Pressurized water (PWR)Under construction1,5342023 (planned)
Shidao Bay 2-2Pressurized water (PWR)Under construction1,5342024 (planned)

Operator: Huaneng Shandong Shidao Bay Nuclear Power CO LTD (Shidao Bay 1) · State Nuclear Power Demonstration Plant CO LTD (Shidao Bay 2-1, Shidao Bay 2-2).

Owner: China Huaneng Group (Shidao Bay 1) · State Nuclear Power Technology CO LTD [75%]; Huaneng Nuclear Power Development CO LTD [25%] (Shidao Bay 2-1, Shidao Bay 2-2).

More information