🇨🇳 China · 22.748, 114.964

Taipingling

3 reactors PWR, in service since 2025.

Operating capacity
0 MWe
net electrical
Units
3
0 operating
First start-up
2025

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Taipingling 1-1Pressurized water (PWR)HPR1000Under construction1,1163,190Dec 20192025 (planned)
Taipingling 1-2Pressurized water (PWR)HPR1000Under construction1,1163,190Oct 20202025 (planned)
Taipingling 2-3Pressurized water (PWR)HPR1000Planned1,2093,180Jun 20252028 (planned)

Operator: CGN Huizhou Nuclear Power CO LTD.

Owner: China General Nuclear Power Group CO LTD (Taipingling 1-1, Taipingling 1-2, Taipingling 2-3).

More information