🇨🇳 China · 22.748, 114.964
Taipingling
3 reactors PWR, in service since 2025.
Operating capacity
0 MWe
net electrical
Units
3
0 operating
First start-up
2025
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Taipingling 1-1 | Pressurized water (PWR) | HPR1000 | Under construction | 1,116 | 3,190 | Dec 2019 | 2025 (planned) | — | — |
| Taipingling 1-2 | Pressurized water (PWR) | HPR1000 | Under construction | 1,116 | 3,190 | Oct 2020 | 2025 (planned) | — | — |
| Taipingling 2-3 | Pressurized water (PWR) | HPR1000 | Planned | 1,209 | 3,180 | Jun 2025 | 2028 (planned) | — | — |
Operator: CGN Huizhou Nuclear Power CO LTD.
Owner: China General Nuclear Power Group CO LTD (Taipingling 1-1, Taipingling 1-2, Taipingling 2-3).