Lianjiang
Lianjiang, nuclear power plant under construction in China, will add 2 pressurized water reactors with 2,448 MW net projected capacity.
Lianjiang 1-1 is under construction.
- Country
- China
- Units
- 2
- Technology
- PWR
- Net capacity
- —
- First grid connection
- —
- Operator
- State Nuclear Zhanjiang Nuclear Power
- Owner
- State Nuclear Power Technology Co Ltd
- Status
- Under construction
See also: alerts for this plant · every plant in China · every PWR reactor · how a PWR works
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
—
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Lianjiang 1-1 | Pressurized water (PWR) | CAP1000 | Under construction | 1,224 | — | — | — | — | — |
| Lianjiang 1-2 | Pressurized water (PWR) | CAP1000 | Under construction | 1,224 | — | — | — | — | — |
Data: Global Energy Monitor · updated on Aug 1, 2026
Lianjiang 1-1, a 1,224 MWe PWR (CAP1000), is under construction.
Lianjiang 1-2, a 1,224 MWe PWR (CAP1000), is under construction.
Operator: State Nuclear Zhanjiang Nuclear Power.
Owner: State Nuclear Power Technology Co Ltd (Lianjiang 1-1, Lianjiang 1-2).