🇨🇳 China · 34.688, 119.462
Tianwan
8 reactors PWR, in service since 2007. Today it delivers 6,240 MWe net, enough for about 19,656,000 households.
Operating capacity
6,240 MWe
net electrical
Units
8
6 operating
First start-up
2007

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Tianwan 1-1 | Pressurized water (PWR) | VVER V-428 | Operating | 1,000 | 3,000 | Oct 20, 1999 | May 12, 2006 | — | 83.6 % (2024) |
| Tianwan 1-2 | Pressurized water (PWR) | VVER V-428 | Operating | 1,000 | 3,000 | Sep 20, 2000 | May 14, 2007 | — | 84.8 % (2024) |
| Tianwan 2-3 | Pressurized water (PWR) | VVER V-428M | Operating | 1,060 | 3,000 | Dec 27, 2012 | Dec 30, 2017 | — | 84.5 % (2024) |
| Tianwan 2-4 | Pressurized water (PWR) | VVER V-428M | Operating | 1,060 | 3,000 | Sep 27, 2013 | Oct 27, 2018 | — | 92.3 % (2024) |
| Tianwan 3-5 | Pressurized water (PWR) | CNP-1000 | Operating | 1,060 | 2,905 | Dec 27, 2015 | Aug 8, 2020 | — | 92.0 % (2024) |
| Tianwan 3-6 | Pressurized water (PWR) | CNP-1000 | Operating | 1,060 | 2,905 | Sep 7, 2016 | May 11, 2021 | — | 91.2 % (2024) |
| Tianwan 4-7 | Pressurized water (PWR) | VVER-1200/V491 | Under construction | 1,171 | 3,200 | May 2021 | — | — | — |
| Tianwan 4-8 | Pressurized water (PWR) | VVER-1200/V491 | Under construction | 1,171 | 3,200 | Feb 2022 | — | — | — |
Operator: Jiangsu Nuclear Power CO LTD.
Owner: China National Nuclear Power CO LTD [50%]; Shanghai Hexi Energy Investment CO LTD [30%]; Jiangsu Guoxin Group CO LTD [20%] (Tianwan 1-1, Tianwan 1-2, Tianwan 2-3, Tianwan 2-4, Tianwan 3-5, Tianwan 3-6, Tianwan 4-7, Tianwan 4-8).