🇨🇳 China · 19.461, 108.901

Changjiang

4 reactors PWR, in service since 2015. Today it delivers 1,202 MWe net, enough for about 3,786,300 households.

Operating capacity
1,202 MWe
net electrical
Units
4
2 operating
First start-up
2015

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Changjiang 1Pressurized water (PWR)CNP-600Operating6011,930Apr 25, 2010Nov 7, 201585.8 % (2024)
Changjiang 2Pressurized water (PWR)CNP-600Operating6011,930Nov 21, 2010Jun 20, 201683.8 % (2024)
Changjiang 3Pressurized water (PWR)Hualong OneUnder construction1,0003,190Mar 20212026 (planned)
Changjiang 4Pressurized water (PWR)Hualong OneUnder construction1,0003,190Dec 20212026 (planned)

Operator: Huaneng Hainan Changjiang Nuclear Power CO LTD.

Owner: Huaneng Nuclear Power Development CO LTD [51%]; China Nuclear Power CORP [49%] (Changjiang 1, Changjiang 2, Changjiang 3, Changjiang 4).