🇨🇳 China · 19.461, 108.901
Changjiang
4 reactors PWR, in service since 2015. Today it delivers 1,202 MWe net, enough for about 3,786,300 households.
Operating capacity
1,202 MWe
net electrical
Units
4
2 operating
First start-up
2015
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Changjiang 1 | Pressurized water (PWR) | CNP-600 | Operating | 601 | 1,930 | Apr 25, 2010 | Nov 7, 2015 | — | 85.8 % (2024) |
| Changjiang 2 | Pressurized water (PWR) | CNP-600 | Operating | 601 | 1,930 | Nov 21, 2010 | Jun 20, 2016 | — | 83.8 % (2024) |
| Changjiang 3 | Pressurized water (PWR) | Hualong One | Under construction | 1,000 | 3,190 | Mar 2021 | 2026 (planned) | — | — |
| Changjiang 4 | Pressurized water (PWR) | Hualong One | Under construction | 1,000 | 3,190 | Dec 2021 | 2026 (planned) | — | — |
Operator: Huaneng Hainan Changjiang Nuclear Power CO LTD.
Owner: Huaneng Nuclear Power Development CO LTD [51%]; China Nuclear Power CORP [49%] (Changjiang 1, Changjiang 2, Changjiang 3, Changjiang 4).