France France · 47.225, 0.166

Chinon

Chinon, nuclear power plant in France, operates 4 pressurized water reactors with 3,620 MW net installed capacity and has been in service since 1964.

Unit Chinon B-2 has been operating for 42 years, since 1984. Its 3,620 MW net are enough to supply about 11,400,000 households.

Country
France
Units
7
Technology
GCR · PWR
Net capacity
3,620 MWe
First grid connection
1964
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
3,620 MWe
net electrical
Units
7
4 operating
First start-up
1964
Chinon
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Chinon A-1Gas-cooled (GCR / AGR)UNGGShut down70300Feb 1957Jun 1963Apr 1973—
Chinon A-2Gas-cooled (GCR / AGR)UNGGShut down180800Aug 1959Feb 1965Jun 1985—
Chinon A-3Gas-cooled (GCR / AGR)UNGGShut down3601,170Mar 1961Aug 1966Jun 1990—
Chinon B-1Pressurized water (PWR)CP2Operating9052,785Mar 1, 1977Nov 30, 1982—55.4 % (2024)
Chinon B-2Pressurized water (PWR)CP2Operating9052,785Mar 1, 1977Nov 29, 1983—63.0 % (2024)
Chinon B-3Pressurized water (PWR)CP2Operating9052,785Oct 1, 1980Oct 20, 1986—67.5 % (2024)
Chinon B-4Pressurized water (PWR)CP2Operating9052,785Feb 1, 1981Nov 14, 1987—62.6 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Chinon A-1, a 70 MWe GCR (UNGG), started construction in 1957 and operated from 1963 to 1973.

Chinon A-2, a 180 MWe GCR (UNGG), started construction in 1959 and operated from 1965 to 1985.

Chinon A-3, a 360 MWe GCR (UNGG), started construction in 1961 and operated from 1966 to 1990.

Chinon B-1, a 905 MWe PWR (CP2), started construction in 1977, was connected to the grid in 1982 and is still operating, with a 55.4% load factor in 2024.

Chinon B-2, a 905 MWe PWR (CP2), started construction in 1977, was connected to the grid in 1983 and is still operating, with a 63% load factor in 2024.

Chinon B-3, a 905 MWe PWR (CP2), started construction in 1980, was connected to the grid in 1986 and is still operating, with a 67.5% load factor in 2024.

Chinon B-4, a 905 MWe PWR (CP2), started construction in 1981, was connected to the grid in 1987 and is still operating, with a 62.6% load factor in 2024.

Operator: Electricité de France.

Owner: Electricité de France SA (Chinon A-1, Chinon A-2, Chinon A-3, Chinon B-1, Chinon B-2, Chinon B-3, Chinon B-4).

More information

Related plants