🇫🇷 France · 49.416, 6.217

Cattenom

4 reactors PWR, in service since 1987. Today it delivers 5,200 MWe net, enough for about 16,380,000 households.

Operating capacity
5,200 MWe
net electrical
Units
4
4 operating
First start-up
1987
Cattenom
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Cattenom 1Pressurized water (PWR)P4 REP 1300Operating1,3003,817Oct 29, 1979Nov 13, 198656.5 % (2024)
Cattenom 2Pressurized water (PWR)P4 REP 1300Operating1,3003,817Jul 28, 1980Sep 17, 198775.8 % (2024)
Cattenom 3Pressurized water (PWR)P4 REP 1300Operating1,3003,817Jun 15, 1982Jul 6, 199077.0 % (2024)
Cattenom 4Pressurized water (PWR)P4 REP 1300Operating1,3003,817Sep 28, 1983May 27, 199140.8 % (2024)

Operator: Electricité De France (EDF).

More information