France France · 49.858, 0.635

Paluel

Paluel, nuclear power plant in France, operates 4 pressurized water reactors with 5,320 MW net installed capacity and has been in service since 1985.

Unit Paluel 2 has been operating for 41 years, since 1985. Its 5,320 MW net are enough to supply about 16,800,000 households.

Country
France
Units
4
Technology
PWR
Net capacity
5,320 MWe
First grid connection
1985
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
5,320 MWe
net electrical
Units
4
4 operating
First start-up
1985
Paluel
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Paluel 1Pressurized water (PWR)P4 REP 1300Operating1,3303,817Aug 15, 1977Jun 22, 1984—66.5 % (2024)
Paluel 2Pressurized water (PWR)P4 REP 1300Operating1,3303,817Jan 1, 1978Sep 14, 1984—56.1 % (2024)
Paluel 3Pressurized water (PWR)P4 REP 1300Operating1,3303,817Feb 1, 1979Sep 30, 1985—59.7 % (2024)
Paluel 4Pressurized water (PWR)P4 REP 1300Operating1,3303,817Feb 1, 1980Apr 11, 1986—83.5 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Paluel 1, a 1,330 MWe PWR (P4 REP 1300), started construction in 1977, was connected to the grid in 1984 and is still operating, with a 66.5% load factor in 2024.

Paluel 2, a 1,330 MWe PWR (P4 REP 1300), started construction in 1978, was connected to the grid in 1984 and is still operating, with a 56.1% load factor in 2024.

Paluel 3, a 1,330 MWe PWR (P4 REP 1300), started construction in 1979, was connected to the grid in 1985 and is still operating, with a 59.7% load factor in 2024.

Paluel 4, a 1,330 MWe PWR (P4 REP 1300), started construction in 1980, was connected to the grid in 1986 and is still operating, with a 83.5% load factor in 2024.

Operator: Electricité de France.

Owner: Electricité de France SA (Paluel 1, Paluel 2, Paluel 3, Paluel 4).