🇨🇳 China · 25.440, 119.443
Fuqing
6 reactors PWR, in service since 2014. Today it delivers 6,150 MWe net, enough for about 19,372,500 households.
Operating capacity
6,150 MWe
net electrical
Units
6
6 operating
First start-up
2014
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Fuqing 1 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Nov 21, 2008 | Aug 20, 2014 | — | 84.9 % (2024) |
| Fuqing 2 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Jun 17, 2009 | Aug 6, 2015 | — | 87.2 % (2024) |
| Fuqing 3 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Dec 31, 2010 | Sep 7, 2016 | — | 88.6 % (2024) |
| Fuqing 4 | Pressurized water (PWR) | CPR-1000 | Operating | 1,000 | 2,905 | Nov 17, 2012 | Jul 29, 2017 | — | 33.0 % (2024) |
| Fuqing 5 | Pressurized water (PWR) | Hualong One | Operating | 1,075 | 3,050 | May 7, 2015 | Nov 27, 2020 | — | 87.9 % (2024) |
| Fuqing 6 | Pressurized water (PWR) | Hualong One | Operating | 1,075 | 3,060 | Dec 22, 2015 | Jan 1, 2022 | — | 89.1 % (2024) |
Operator: Fujian Fuqing Nuclear Power CO LTD.
Owner: China Nuclear Power CO LTD [51%]; Huadian New Energy Group CO LTD [39%]; Fujian Investment and Development Group CO LTD [10%] (Fuqing 1, Fuqing 2, Fuqing 3, Fuqing 4, Fuqing 5, Fuqing 6).