Nuclear reactors supplied by CNNC
CNNC is recorded as the nuclear steam supply system (NSSS) supplier of 26 units in 2 countries, per the IAEA PRIS register: 19 operating with 14,254 MWe net and 7 under construction.
China's state nuclear corporation, with its NPIC and SNERDI design institutes: CNP-300, CNP-600 and Hualong One. By country: China (19) and Pakistan (7). By technology: 26 PWR. The first unit was connected in 1991 and the most recent in 2022. The most powerful unit in operation is Fuqing 5, in China, with 1,075 MWe. 7 units are under construction: Haiyang 2-3 (China), Haiyang 2-4 (China), Jinqimen 1-1 (China) and Chashma 5 (Pakistan) and others. It also designed or built 2 research reactors, listed below.
PRIS supplier codes: CNNC, CIAE(Chi, SNERDI, Shanghai, NPIC, CZEC · Reference · Names per IAEA, Nuclear Power Reactors in the World 2025, table 25 · See on the research reactor map
Units with a CNNC nuclear steam supply system
| Unit | Country | Type | Model | MWe | Grid connection | Status |
|---|---|---|---|---|---|---|
| Qinshan 1-1 | PWR | CNP-300 | 326 | 1991 | Operating | |
| Chashma 1 | PWR | CNP-300 | 300 | 2000 | Operating | |
| Qinshan 2-1 | PWR | CNP-600 | 623 | 2002 | Operating | |
| Qinshan 2-2 | PWR | CNP-600 | 623 | 2004 | Operating | |
| Qinshan 2-3 | PWR | CNP-600 | 623 | 2010 | Operating | |
| Qinshan 2-4 | PWR | CNP-600 | 623 | 2011 | Operating | |
| Chashma 2 | PWR | CNP-300 | 300 | 2011 | Operating | |
| Fangjiashan 1 | PWR | CPR-1000 | 1,012 | 2014 | Operating | |
| Fuqing 1 | PWR | CNP-1000 (CNNC) (CNP-1000) | 1,000 | 2014 | Operating | |
| Fangjiashan 2 | PWR | CPR-1000 | 1,012 | 2015 | Operating | |
| Fuqing 2 | PWR | CNP-1000 (CNNC) (CNP-1000) | 1,000 | 2015 | Operating | |
| Fuqing 3 | PWR | CNP-1000 (CNNC) (CNP-1000) | 1,000 | 2016 | Operating | |
| Chashma 3 | PWR | CNP-300 | 315 | 2016 | Operating | |
| Fuqing 4 | PWR | CNP-1000 (CNNC) (CNP-1000) | 1,000 | 2017 | Operating | |
| Chashma 4 | PWR | CNP-300 | 313 | 2017 | Operating | |
| Fuqing 5 | PWR | Hualong One (HPR1000) | 1,075 | 2020 | Operating | |
| Karachi 2 | PWR | ACP1000 | 1,017 | 2021 | Operating | |
| Fuqing 6 | PWR | Hualong One (HPR1000) | 1,075 | 2022 | Operating | |
| Karachi 3 | PWR | ACP1000 | 1,017 | 2022 | Operating | |
| Haiyang 2-3 | PWR | CAP1000 | 1,161 | 2027 | Under construction | |
| Haiyang 2-4 | PWR | CAP1000 | 1,161 | 2027 | Under construction | |
| Jinqimen 1-1 | PWR | Hualong One (HPR1000) | 1,145 | 2030 | Under construction | |
| Chashma 5 | PWR | Hualong One (Hualong-1) | 1,117 | 2030 | Under construction | |
| Jinqimen 1-2 | PWR | Hualong One (HPR1000) | 1,145 | 2031 | Under construction | |
| Sanmen 2-3 | PWR | CAP1000 | 1,163 | — | Under construction | |
| Sanmen 2-4 | PWR | CAP1000 | 1,163 | — | Under construction |
Research reactors designed or built
Data: Global Energy Monitor (CC BY 4.0), IAEA PRIS 2025, Wikipedia (CC BY-SA), Wikidata and Wikimedia Commons. Capacities in net MWe unless stated.
Other vendors
Westinghouse · Framatome · General Electric · Rosatom (Atomenergomash, Atomstroyexport) · Atomenergoexport (USSR) · China First Heavy Industries · Siemens / Kraftwerk Union · Nuclear Power Corporation of India · Vendors