Canada Canada · 43.811, -79.069

Pickering

Pickering, nuclear power plant in Canada, operates 4 pressurized heavy water reactors with 2,064 MW net installed capacity and has been in service since 1971.

Unit Pickering B5 has been operating for 43 years, since 1983. Its 2,064 MW net are enough to supply about 6,500,000 households.

Country
Canada
Units
8
Technology
PHWR
Net capacity
2,064 MWe
First grid connection
1971
Operator
Ontario Power Generation
Owner
Ontario Power Generation Inc
Status
Operating
Operating capacity
2,064 MWe
net electrical
Units
8
4 operating
First start-up
1971
Pickering
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLicence untilLoad factor
Pickering A1Pressurized heavy water (PHWR · CANDU)CANDU 500AShut down5151,744Jun 1, 1966Apr 4, 1971Oct 2024Aug 31, 202898.1 % (2024)
Pickering A2Pressurized heavy water (PHWR · CANDU)CANDU 500AShut down5151,744Sep 1966Oct 1971May 2007Aug 31, 2028—
Pickering A3Pressurized heavy water (PHWR · CANDU)CANDU 500AShut down5151,744Dec 1967May 1972Oct 2008Aug 31, 2028—
Pickering A4Pressurized heavy water (PHWR · CANDU)CANDU 500AShut down5151,744May 1, 1968May 21, 1973Dec 2024Aug 31, 202892.4 % (2024)
Pickering B5Pressurized heavy water (PHWR · CANDU)CANDU 500BOperating5161,744Nov 1, 1974Dec 19, 1982—Aug 31, 202859.4 % (2024)
Pickering B6Pressurized heavy water (PHWR · CANDU)CANDU 500BOperating5161,744Oct 1, 1975Nov 8, 1983—Aug 31, 202898.8 % (2024)
Pickering B7Pressurized heavy water (PHWR · CANDU)CANDU 500BOperating5161,744Mar 1, 1976Nov 17, 1984—Aug 31, 202857.5 % (2024)
Pickering B8Pressurized heavy water (PHWR · CANDU)CANDU 500BOperating5161,744Sep 1, 1976Jan 21, 1986—Aug 31, 202891.3 % (2024)

Data: IAEA PRIS · Global Energy Monitor · editorial review · updated on Sep 21, 2026

Pickering A1, a 515 MWe PHWR (CANDU 500A), started construction in 1966 and operated from 1971 to 2024.

Pickering A2, a 515 MWe PHWR (CANDU 500A), started construction in 1966 and operated from 1971 to 2007.

Pickering A3, a 515 MWe PHWR (CANDU 500A), started construction in 1967 and operated from 1972 to 2008.

Pickering A4, a 515 MWe PHWR (CANDU 500A), started construction in 1968 and operated from 1973 to 2024.

Pickering B5, a 516 MWe PHWR (CANDU 500B), started construction in 1974, was connected to the grid in 1982 and is still operating, with a 59.4% load factor in 2024.

Pickering B6, a 516 MWe PHWR (CANDU 500B), started construction in 1975, was connected to the grid in 1983 and is still operating, with a 98.8% load factor in 2024.

Pickering B7, a 516 MWe PHWR (CANDU 500B), started construction in 1976, was connected to the grid in 1984 and is still operating, with a 57.5% load factor in 2024.

Pickering B8, a 516 MWe PHWR (CANDU 500B), started construction in 1976, was connected to the grid in 1986 and is still operating, with a 91.3% load factor in 2024.

Operator: Ontario Power Generation.

Owner: Ontario Power Generation Inc (Pickering A1, Pickering A2, Pickering A3, Pickering A4, Pickering B5, Pickering B6, Pickering B7, Pickering B8).