Canada Canada · 44.339, -81.575

Bruce

Bruce, nuclear power plant in Canada, operates 7 pressurized heavy water reactors with 5,671 MW net installed capacity and has been in service since 1977. One more unit has its operation suspended.

It is the highest-capacity nuclear plant in Canada. Unit Bruce A2 has been operating for 49 years, since 1977. Its 6,478 MW net are enough to supply about 20,400,000 households.

Country
Canada
Units
8
Technology
PHWR
Net capacity
5,671 MWe
First grid connection
1977
Operator
Bruce Power
Owner
Ontario Power Generation Inc
Status
Operating
Operating capacity
5,671 MWe
net electrical
Units
8
7 operating · 1 suspended
First start-up
1977
Bruce
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLicence untilLoad factor
Bruce A1Pressurized heavy water (PHWR · CANDU)CANDU 791Operating8162,620Jun 1, 1971Jan 14, 1977—Sep 30, 202880.9 % (2024)
Bruce A2Pressurized heavy water (PHWR · CANDU)CANDU 791Operating8172,620Dec 1, 1970Sep 4, 1976—Sep 30, 2028100.1 % (2024)
Bruce A3Pressurized heavy water (PHWR · CANDU)CANDU 750AOperating7702,550Jul 1, 1972Dec 12, 1977—Sep 30, 20280.0 % (2024)
Bruce A4Pressurized heavy water (PHWR · CANDU)CANDU 750AOffline for refurbishment8072,550Sep 1, 1972Dec 21, 1978—Sep 30, 202896.2 % (2024)
Bruce B5Pressurized heavy water (PHWR · CANDU)CANDU 750BOperating8172,832May 31, 1978Dec 1, 1984—Sep 30, 202893.3 % (2024)
Bruce B6Pressurized heavy water (PHWR · CANDU)CANDU 750BOperating8172,690Jan 1, 1978Jun 26, 1984—Sep 30, 202895.2 % (2024)
Bruce B7Pressurized heavy water (PHWR · CANDU)CANDU 750BOperating8172,832May 1, 1979Feb 22, 1986—Sep 30, 202882.4 % (2024)
Bruce B8Pressurized heavy water (PHWR · CANDU)CANDU 750BOperating8172,690Jul 30, 1979Mar 7, 1987—Sep 30, 202893.7 % (2024)

Data: IAEA PRIS · Global Energy Monitor · editorial review · updated on Sep 21, 2026

Bruce A1, an 816 MWe PHWR (CANDU 791), started construction in 1971, was connected to the grid in 1977 and is still operating, with a 80.9% load factor in 2024.

Bruce A2, an 817 MWe PHWR (CANDU 791), started construction in 1970, was connected to the grid in 1976 and is still operating, with a 100.1% load factor in 2024.

Bruce A3, a 770 MWe PHWR (CANDU 750A), started construction in 1972, was connected to the grid in 1977 and is still operating.

Bruce A4, an 807 MWe PHWR (CANDU 750A), started construction in 1972, was connected to the grid in 1978 and is currently suspended.

Bruce B5, an 817 MWe PHWR (CANDU 750B), started construction in 1978, was connected to the grid in 1984 and is still operating, with a 93.3% load factor in 2024.

Bruce B6, an 817 MWe PHWR (CANDU 750B), started construction in 1978, was connected to the grid in 1984 and is still operating, with a 95.2% load factor in 2024.

Bruce B7, an 817 MWe PHWR (CANDU 750B), started construction in 1979, was connected to the grid in 1986 and is still operating, with a 82.4% load factor in 2024.

Bruce B8, an 817 MWe PHWR (CANDU 750B), started construction in 1979, was connected to the grid in 1987 and is still operating, with a 93.7% load factor in 2024.

Operator: Bruce Power.

Owner: Ontario Power Generation Inc (Bruce A1, Bruce A2, Bruce A3, Bruce A4, Bruce B5, Bruce B6, Bruce B7, Bruce B8).

More information

Related plants