🇨🇳 China · 29.056, 121.945
Jinqimen
One reactor PWR, in service since 2028.
Operating capacity
0 MWe
net electrical
Units
1
0 operating
First start-up
2028
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Jinqimen 1-1 | Pressurized water (PWR) | — | Planned | 1,200 | — | — | 2028 (planned) | — | — |
Operator: CNNC Zheneng Energy CO LTD.
Owner: China National Nuclear Power CO LTD [50%]; Zhejiang Energy Group CO LTD [50%].