🇨🇳 China · 36.777, 121.159
Haiyang
5 reactors PWR, in service since 2018. Today it delivers 2,340 MWe net, enough for about 7,371,000 households.
Operating capacity
2,340 MWe
net electrical
Units
5
2 operating
First start-up
2018
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Haiyang 5 | Pressurized water (PWR) | CAP-1000 | Planned | 1,250 | — | — | 2028 (planned) | — | — |
| Haiyang 1-1 | Pressurized water (PWR) | AP-1000 | Operating | 1,170 | 3,415 | Sep 24, 2009 | Aug 17, 2018 | — | 95.3 % (2024) |
| Haiyang 1-2 | Pressurized water (PWR) | AP-1000 | Operating | 1,170 | 3,415 | Jun 20, 2010 | Oct 13, 2018 | — | 90.6 % (2024) |
| Haiyang 2-3 | Pressurized water (PWR) | CAP1000 | Under construction | 1,161 | 3,400 | Jul 2022 | 2027 (planned) | — | — |
| Haiyang 2-4 | Pressurized water (PWR) | CAP1000 | Under construction | 1,161 | 3,400 | Apr 2023 | 2027 (planned) | — | — |
Operator: Shandong Nuclear Power CO LTD.
Owner: State Power Investment Nuclear Energy CO LTD [65%]; Shandong Development Investment Holding Group CO LTD [10%]; Yantai Blue Sky Investment Holdings CO LTD [10%]; Huaneng Nuclear Power Development CO LTD [5%]; National Energy Investment Group CO LTD [5%]; China National Nuclear Power CO LTD [5%] (Haiyang 5, Haiyang 1-1, Haiyang 1-2, Haiyang 2-3, Haiyang 2-4).