🇨🇳 China · 36.777, 121.159

Haiyang

5 reactors PWR, in service since 2018. Today it delivers 2,340 MWe net, enough for about 7,371,000 households.

Operating capacity
2,340 MWe
net electrical
Units
5
2 operating
First start-up
2018

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Haiyang 5Pressurized water (PWR)CAP-1000Planned1,2502028 (planned)
Haiyang 1-1Pressurized water (PWR)AP-1000Operating1,1703,415Sep 24, 2009Aug 17, 201895.3 % (2024)
Haiyang 1-2Pressurized water (PWR)AP-1000Operating1,1703,415Jun 20, 2010Oct 13, 201890.6 % (2024)
Haiyang 2-3Pressurized water (PWR)CAP1000Under construction1,1613,400Jul 20222027 (planned)
Haiyang 2-4Pressurized water (PWR)CAP1000Under construction1,1613,400Apr 20232027 (planned)

Operator: Shandong Nuclear Power CO LTD.

Owner: State Power Investment Nuclear Energy CO LTD [65%]; Shandong Development Investment Holding Group CO LTD [10%]; Yantai Blue Sky Investment Holdings CO LTD [10%]; Huaneng Nuclear Power Development CO LTD [5%]; National Energy Investment Group CO LTD [5%]; China National Nuclear Power CO LTD [5%] (Haiyang 5, Haiyang 1-1, Haiyang 1-2, Haiyang 2-3, Haiyang 2-4).

More information