South Korea South Korea · 35.320, 129.295

Kori

Kori, nuclear power plant in South Korea, operates 5 pressurized water reactors with 5,392 MW net installed capacity and has been in service since 1978. 2 more units have their operation suspended.

It is South Korea's oldest nuclear plant, operating since 1978. Unit Kori 2 has been operating for 43 years, since 1983. Saeul 3 is under construction, with grid connection expected in 2026.

Country
South Korea
Units
10
Technology
PWR
Net capacity
5,392 MWe
First grid connection
1978
Operator
Korea Hydro & Nuclear Power
Owner
Korea Hydro & Nuclear Power Co
Status
Operating
Operating capacity
5,392 MWe
net electrical
Units
10
5 operating · 2 suspended
First start-up
1978
Kori
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLicence untilLoad factor
Kori 1Pressurized water (PWR)WH 60Shut down5761,729Aug 1972Jun 1977Jun 2017——
Saeul 1Pressurized water (PWR)APR-1400Operating1,3923,983Oct 16, 2008Jan 15, 2016——96.8 % (2024)
Shin-Kori 1Pressurized water (PWR)OPR-1000Operating9862,825Jun 16, 2006Aug 4, 2010——87.5 % (2024)
Kori 2Pressurized water (PWR)WH FOperating6401,882Dec 23, 1977Apr 22, 1983—Apr 8, 20330.0 % (2024)
Saeul 2Pressurized water (PWR)APR-1400Operating1,3923,983Aug 19, 2009Apr 22, 2019——86.3 % (2024)
Shin-Kori 2Pressurized water (PWR)OPR-1000Operating9822,825Jun 5, 2007Jan 28, 2012——89.7 % (2024)
Kori 3Pressurized water (PWR)WH FOffline by regulatory decision9962,912Oct 1, 1979Jan 22, 1985—Sep 28, 202474.7 % (2024)
Saeul 3Pressurized water (PWR)APR-1400Under construction1,3403,983Apr 20172026 (planned)———
Kori 4Pressurized water (PWR)WH FOffline by regulatory decision1,0012,912Apr 1, 1980Dec 31, 1985—Aug 6, 202584.6 % (2024)
Saeul 4Pressurized water (PWR)APR-1400Under construction1,3403,983Sep 20182026 (planned)———

Data: IAEA PRIS · Wikipedia · editorial review · updated on Sep 21, 2026

Kori 1, a 576 MWe PWR (WH 60), started construction in 1972 and operated from 1977 to 2017.

Saeul 1, a 1,392 MWe PWR (APR-1400), started construction in 2008, was connected to the grid in 2016 and is still operating, with a 96.8% load factor in 2024.

Shin-Kori 1, a 986 MWe PWR (OPR-1000), started construction in 2006, was connected to the grid in 2010 and is still operating, with a 87.5% load factor in 2024.

Kori 2, a 640 MWe PWR (WH F), started construction in 1977, was connected to the grid in 1983 and is still operating.

Saeul 2, a 1,392 MWe PWR (APR-1400), started construction in 2009, was connected to the grid in 2019 and is still operating, with a 86.4% load factor in 2024.

Shin-Kori 2, a 982 MWe PWR (OPR-1000), started construction in 2007, was connected to the grid in 2012 and is still operating, with a 89.7% load factor in 2024.

Kori 3, a 996 MWe PWR (WH F), started construction in 1979, was connected to the grid in 1985 and is currently suspended.

Saeul 3, a 1,340 MWe PWR (APR-1400), has been under construction since 2017, with grid connection expected in 2026.

Kori 4, a 1,001 MWe PWR (WH F), started construction in 1980, was connected to the grid in 1985 and is currently suspended.

Saeul 4, a 1,340 MWe PWR (APR-1400), has been under construction since 2018, with grid connection expected in 2026.

Operator: Korea Hydro & Nuclear Power.

Owner: Korea Hydro & Nuclear Power Co (Kori 1, Saeul 1, Shin-Kori 1, Kori 2, Saeul 2, Shin-Kori 2, Kori 3, Saeul 3, Kori 4, Saeul 4).