🇰🇷 South Korea · 37.093, 129.383
Hanul
10 reactors PWR, in service since 1988. Today it delivers 8,716 MWe net, enough for about 27,455,400 households.
Operating capacity
8,716 MWe
net electrical
Units
10
8 operating
First start-up
1988

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Hanul 1 | Pressurized water (PWR) | CP1 (France) | Operating | 953 | 2,775 | Jan 26, 1983 | Apr 7, 1988 | — | 96.3 % (2024) |
| Shin-Hanul 1 | Pressurized water (PWR) | APR-1400 | Operating | 1,429 | 3,983 | Jul 10, 2012 | Jun 9, 2022 | — | 66.7 % (2024) |
| Hanul 2 | Pressurized water (PWR) | CP1 (France) | Operating | 957 | 2,775 | Jul 5, 1983 | Apr 14, 1989 | — | 87.0 % (2024) |
| Shin-Hanul 2 | Pressurized water (PWR) | APR-1400 | Operating | 1,416 | 3,983 | Jun 19, 2013 | Dec 21, 2023 | — | 94.9 % (2024) |
| Hanul 3 | Pressurized water (PWR) | OPR-1000 | Operating | 991 | 2,825 | Jul 21, 1993 | Jan 6, 1998 | — | 77.6 % (2024) |
| Shin-Hanul 3 | Pressurized water (PWR) | APR-1400 | Planned | 1,400 | — | May 20, 2025 | 2032 (planned) | — | — |
| Hanul 4 | Pressurized water (PWR) | OPR-1000 | Operating | 994 | 2,825 | Nov 1, 1993 | Dec 28, 1998 | — | 79.2 % (2024) |
| Shin-Hanul 4 | Pressurized water (PWR) | APR-1400 | Planned | 1,400 | — | May 29, 2026 | 2033 (planned) | — | — |
| Hanul 5 | Pressurized water (PWR) | OPR-1000 | Operating | 989 | 2,825 | Oct 1, 1999 | Dec 18, 2003 | — | 72.5 % (2024) |
| Hanul 6 | Pressurized water (PWR) | OPR-1000 | Operating | 987 | 2,825 | Sep 29, 2000 | Jan 7, 2005 | — | 94.3 % (2024) |
Operator: Korea Hydro & Nuclear Power CO.