Hungary Hungary · 46.578, 18.853

Paks

Paks, nuclear power plant in Hungary, operates 4 pressurized water reactors with 1,916 MW net installed capacity and has been in service since 1983.

Unit Paks 1 has been operating for 43 years, since 1983. Paks 5 is under construction, with grid connection expected in 2032. Its 1,916 MW net are enough to supply about 6,040,000 households.

Country
Hungary
Units
6
Technology
PWR
Net capacity
1,916 MWe
First grid connection
1983
Operator
MVM Paks Nuclear Power Plant
Owner
MVM Hungarian Electricity Ltd
Status
Operating
Operating capacity
1,916 MWe
net electrical
Units
6
4 operating
First start-up
1983
Paks
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Paks 1Pressurized water (PWR)VVER-440 (V-213)Operating4791,485Aug 1, 1974Dec 28, 1982—98.7 % (2024)
Paks 2Pressurized water (PWR)VVER-440 (V-213)Operating4791,485Aug 1, 1974Sep 6, 1984—91.7 % (2024)
Paks 3Pressurized water (PWR)VVER-440 (V-213)Operating4791,485Oct 1, 1979Sep 28, 1986—89.1 % (2024)
Paks 4Pressurized water (PWR)VVER-440 (V-213)Operating4791,485Oct 1, 1979Aug 16, 1987—81.0 % (2024)
Paks 5Pressurized water (PWR)VVER-1200Under construction1,1853,200Feb 5, 20262032 (planned)——
Paks 6Pressurized water (PWR)VVER-1200Planned1,1853,20020262032 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · editorial review · updated on Sep 21, 2026

Paks 1, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1974, was connected to the grid in 1982 and is still operating, with a 98.7% load factor in 2024.

Paks 2, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1974, was connected to the grid in 1984 and is still operating, with a 91.7% load factor in 2024.

Paks 3, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1986 and is still operating, with a 89.1% load factor in 2024.

Paks 4, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1987 and is still operating, with a 81% load factor in 2024.

Paks 5, a 1,185 MWe PWR (VVER-1200), has been under construction since 2026, with grid connection expected in 2032.

Paks 6, a 1,185 MWe PWR (VVER-1200), is planned, with grid connection expected in 2032.

Operator: MVM Paks Nuclear Power Plant.

Owner: MVM Hungarian Electricity Ltd (Paks 1, Paks 2, Paks 3, Paks 4, Paks 5, Paks 6).