🇫🇷 France · 49.537, -1.882

Flamanville

3 reactors PWR, in service since 1986. Today it delivers 4,290 MWe net, enough for about 13,513,500 households.

Operating capacity
4,290 MWe
net electrical
Units
3
3 operating
First start-up
1986
Flamanville
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Flamanville 1Pressurized water (PWR)P4 REP 1300Operating1,3303,817Dec 1, 1979Dec 4, 198578.9 % (2024)
Flamanville 2Pressurized water (PWR)P4 REP 1300Operating1,3303,817May 1, 1980Jul 18, 198641.4 % (2024)
Flamanville 3Pressurized water (PWR)EPROperating1,6304,300Dec 3, 2007Dec 21, 2024

Operator: Electricité De France (EDF).