France France · 49.537, -1.882

Flamanville

Flamanville, nuclear power plant in France, operates 3 pressurized water reactors with 4,290 MW net installed capacity and has been in service since 1986.

Unit Flamanville 1 has been operating for 40 years, since 1986. Its 4,290 MW net are enough to supply about 13,500,000 households.

Country
France
Units
3
Technology
PWR
Net capacity
4,290 MWe
First grid connection
1986
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
4,290 MWe
net electrical
Units
3
3 operating
First start-up
1986
Flamanville
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Flamanville 1Pressurized water (PWR)P4 REP 1300Operating1,3303,817Dec 1, 1979Dec 4, 1985—78.9 % (2024)
Flamanville 2Pressurized water (PWR)P4 REP 1300Operating1,3303,817May 1, 1980Jul 18, 1986—41.4 % (2024)
Flamanville 3Pressurized water (PWR)EPROperating1,6304,300Dec 3, 2007Dec 21, 2024——

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Flamanville 1, a 1,330 MWe PWR (P4 REP 1300), started construction in 1979, was connected to the grid in 1985 and is still operating, with a 78.9% load factor in 2024.

Flamanville 2, a 1,330 MWe PWR (P4 REP 1300), started construction in 1980, was connected to the grid in 1986 and is still operating, with a 41.4% load factor in 2024.

Flamanville 3, a 1,630 MWe PWR (EPR), started construction in 2007, was connected to the grid in 2024 and is still operating.

Operator: Electricité de France.

Owner: Electricité de France SA (Flamanville 1, Flamanville 2, Flamanville 3).