China China · 36.979, 122.532

Shidao Bay

Shidao Bay, nuclear power plant in China, operates 3 reactors: 1 high-temperature gas and 2 pressurized water with 3,218 MW net installed capacity and has been in service since 2023.

It is the only plant in China running HTGR technology. Shidao Bay 3-1 is under construction, with grid connection expected in 2029. Its 3,218 MW net are enough to supply about 10,100,000 households.

Country
China
Units
5
Technology
HTGR · PWR
Net capacity
3,218 MWe
First grid connection
2023
Operator
Huaneng Shandong Shidao Bay Nuclear Power · State Nuclear Power Demonstration Plant
Owner
China Huaneng Group Co Ltd · State Nuclear Power Technology Co Ltd · Huaneng Nuclear Power Development Co Ltd
Status
Operating
Operating capacity
3,218 MWe
net electrical
Units
5
3 operating
First start-up
2023

Units

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · editorial review · updated on Sep 21, 2026

Shidao Bay 1, a 150 MWe HTGR (HTR-PM), started construction in 2012, was connected to the grid in 2021 and is still operating, with a 20.7% load factor in 2024.

Shidao Bay 2-1, a 1,534 MWe gross PWR (CAP1400), was connected to the grid in 2024 and is still operating.

Shidao Bay 2-2, a 1,534 MWe gross PWR (CAP1400), was connected to the grid in 2025 and is still operating.

Shidao Bay 3-1, a 1,134 MWe PWR (Hualong One (HPR1000)), has been under construction since 2024, with grid connection expected in 2029.

Shidao Bay 3-2, a 1,134 MWe PWR (Hualong One (HPR1000)), has been under construction since 2025, with grid connection expected in 2029.

Operator: Huaneng Shandong Shidao Bay Nuclear Power (Shidao Bay 1, Shidao Bay 3-1, Shidao Bay 3-2) · State Nuclear Power Demonstration Plant (Shidao Bay 2-1, Shidao Bay 2-2).

Owner: China Huaneng Group Co Ltd (Shidao Bay 1) · State Nuclear Power Technology Co Ltd (Shidao Bay 2-1, Shidao Bay 2-2) · Huaneng Nuclear Power Development Co Ltd (Shidao Bay 3-1, Shidao Bay 3-2).