China China · 27.045, 120.285

Ningde

Ningde, nuclear power plant in China, operates 4 pressurized water reactors with 4,072 MW net installed capacity and has been in service since 2013.

Ningde 2-5 is under construction. Its 4,072 MW net are enough to supply about 12,800,000 households.

Country
China
Units
6
Technology
PWR
Net capacity
4,072 MWe
First grid connection
2013
Operator
Fujian Ningde Nuclear Power
Owner
CGN Ninghe Investment Co Ltd
Status
Operating
Operating capacity
4,072 MWe
net electrical
Units
6
4 operating
First start-up
2013

Units

Data: IAEA PRIS · Global Energy Monitor · editorial review · updated on Sep 21, 2026

Ningde 1-1, a 1,018 MWe PWR (CPR-1000), started construction in 2008, was connected to the grid in 2012 and is still operating, with a 94.2% load factor in 2024.

Ningde 1-2, a 1,018 MWe PWR (CPR-1000), started construction in 2008, was connected to the grid in 2014 and is still operating, with a 84% load factor in 2024.

Ningde 1-3, a 1,018 MWe PWR (CPR-1000), started construction in 2010, was connected to the grid in 2015 and is still operating, with a 95.3% load factor in 2024.

Ningde 1-4, a 1,018 MWe PWR (CPR-1000), started construction in 2010, was connected to the grid in 2016 and is still operating, with a 99.9% load factor in 2024.

Ningde 2-5, a 1,200 MWe PWR (Hualong One (HPR1000)), has been under construction since 2024.

Ningde 2-6, a 1,117 MWe PWR (Hualong One (HPR1000)), has been under construction since 2025.

Operator: Fujian Ningde Nuclear Power.

Owner: CGN Ninghe Investment Co Ltd (Ningde 1-1, Ningde 1-2, Ningde 1-3, Ningde 1-4, Ningde 2-5, Ningde 2-6).