Nuclear reactors supplied by British nuclear consortia (NPC, APC, EE/B&W/T, GEC, NNC)
British nuclear consortia (NPC, APC, EE/B&W/T, GEC, NNC) is recorded as the nuclear steam supply system (NSSS) supplier of 23 units in 2 countries, per the IAEA PRIS register: 9 operating with 5,883 MWe net and 14 shut down.
The consortia that built Britain's Magnox and AGR stations besides TNPG: Nuclear Power Company, Atomic Power Construction, English Electric with Babcock and Taylor Woodrow, GEC and the National Nuclear Corporation. By country: United Kingdom (22) and Japan (1). By technology: 21 GCR, 1 SGHWR and 1 PWR. The first unit was connected in 1964 and the most recent in 1995. The most powerful unit in operation is Sizewell B, in the United Kingdom, with 1,198 MWe. 14 units have been permanently shut down.
PRIS supplier codes: NPC, APC, EE/B&W/T, GEC, NNC, ICL/FE, PPC · Reference · Names per IAEA, Nuclear Power Reactors in the World 2025, table 25
Units with a British nuclear consortia (NPC, APC, EE/B&W/T, GEC, NNC) nuclear steam supply system
| Unit | Country | Type | Model | MWe | Grid connection | Status |
|---|---|---|---|---|---|---|
| Hunterston A1 | GCR | MAGNOX | 150 | 1964 | Shut down | |
| Hunterston A2 | GCR | MAGNOX | 150 | 1964 | Shut down | |
| Tokai 1 | GCR | Magnox | 137 | 1965 | Shut down | |
| Hinkley Point A1 | GCR | MAGNOX | 235 | 1965 | Shut down | |
| Hinkley Point A2 | GCR | MAGNOX | 235 | 1965 | Shut down | |
| Trawsfynydd 1 | GCR | Magnox | 195 | 1965 | Shut down | |
| Trawsfynydd 2 | GCR | Magnox | 195 | 1965 | Shut down | |
| Sizewell A1 | GCR | MAGNOX | 210 | 1966 | Shut down | |
| Sizewell A2 | GCR | MAGNOX | 210 | 1966 | Shut down | |
| Winfrith SGHWR | SGHWR | SGHWR | 92 | 1967 | Shut down | |
| Wylfa 1 | GCR | Magnox | 490 | 1971 | Shut down | |
| Wylfa 2 | GCR | Magnox | 490 | 1971 | Shut down | |
| Dungeness B1 | GCR | AGR | 545 | 1983 | Shut down | |
| Hartlepool A1 | GCR | AGR | 590 | 1983 | Operating | |
| Heysham A1 | GCR | AGR | 485 | 1983 | Operating | |
| Hartlepool A2 | GCR | AGR | 595 | 1984 | Operating | |
| Heysham A2 | GCR | AGR | 575 | 1984 | Operating | |
| Dungeness B2 | GCR | AGR | 545 | 1985 | Shut down | |
| Heysham B1 | GCR | AGR | 620 | 1988 | Operating | |
| Heysham B2 | GCR | AGR | 620 | 1988 | Operating | |
| Torness 1 | GCR | AGR | 595 | 1988 | Operating | |
| Torness 2 | GCR | AGR | 605 | 1989 | Operating | |
| Sizewell B | PWR | SNUPPS | 1,198 | 1995 | Operating |
Data: Global Energy Monitor (CC BY 4.0), IAEA PRIS 2025, Wikipedia (CC BY-SA), Wikidata and Wikimedia Commons. Capacities in net MWe unless stated.
Other vendors
Westinghouse · Framatome · General Electric · Rosatom (Atomenergomash, Atomstroyexport) · Atomenergoexport (USSR) · China First Heavy Industries · Siemens / Kraftwerk Union · Nuclear Power Corporation of India · Vendors