United Kingdom United Kingdom · 54.029, -2.915

Heysham

Heysham, nuclear power plant in United Kingdom, operates 4 gas-cooled reactors with 2,300 MW net installed capacity and has been in service since 1989.

GCR technology exists in only 2 countries worldwide. It is the highest-capacity nuclear plant in United Kingdom. Unit Heysham B2 has been operating for 37 years, since 1989.

Country
United Kingdom
Units
4
Technology
GCR
Net capacity
2,300 MWe
First grid connection
1989
Operator
EDF Energy
Owner
EDF Energy Ltd
Status
Operating
Operating capacity
2,300 MWe
net electrical
Units
4
4 operating
First start-up
1989
Heysham
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Heysham A1Gas-cooled (GCR / AGR)AGROperating4851,500Dec 1, 1970Jul 9, 19832030 (planned)68.8 % (2024)
Heysham A2Gas-cooled (GCR / AGR)AGROperating5751,500Dec 1, 1970Oct 11, 19842030 (planned)56.2 % (2024)
Heysham B1Gas-cooled (GCR / AGR)AGROperating6201,550Aug 1, 1980Jul 12, 19882030 (planned)78.0 % (2024)
Heysham B2Gas-cooled (GCR / AGR)AGROperating6201,550Aug 1, 1980Nov 11, 19882030 (planned)79.1 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Heysham A1, a 485 MWe GCR (AGR), started construction in 1970, was connected to the grid in 1983 and is still operating, with a 68.8% load factor in 2024.

Heysham A2, a 575 MWe GCR (AGR), started construction in 1970, was connected to the grid in 1984 and is still operating, with a 56.2% load factor in 2024.

Heysham B1, a 620 MWe GCR (AGR), started construction in 1980, was connected to the grid in 1988 and is still operating, with a 78% load factor in 2024.

Heysham B2, a 620 MWe GCR (AGR), started construction in 1980, was connected to the grid in 1988 and is still operating, with a 79.1% load factor in 2024.

Operator: EDF Energy.

Owner: EDF Energy Ltd (Heysham A1, Heysham A2, Heysham B1, Heysham B2).