France France · 51.014, 2.133

Gravelines

Gravelines, nuclear power plant in France, operates 6 pressurized water reactors with 5,460 MW net installed capacity and has been in service since 1980.

It is the highest-capacity nuclear plant in France. Unit Gravelines 2 has been operating for 46 years, since 1980. Its 5,460 MW net are enough to supply about 17,200,000 households.

Country
France
Units
6
Technology
PWR
Net capacity
5,460 MWe
First grid connection
1980
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
5,460 MWe
net electrical
Units
6
6 operating
First start-up
1980
Gravelines
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Gravelines 1Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Feb 1, 1975Mar 13, 1980—77.3 % (2024)
Gravelines 2Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Mar 1, 1975Aug 26, 1980—75.7 % (2024)
Gravelines 3Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Dec 1, 1975Dec 12, 1980—67.3 % (2024)
Gravelines 4Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Apr 1, 1976Jun 14, 1981—36.2 % (2024)
Gravelines 5Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Oct 1, 1979Aug 28, 1984—67.4 % (2024)
Gravelines 6Pressurized water (PWR)Framatome CP1 (CP1)Operating9102,785Oct 1, 1979Aug 1, 1985—87.5 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Gravelines 1, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1975, was connected to the grid in 1980 and is still operating, with a 77.3% load factor in 2024.

Gravelines 2, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1975, was connected to the grid in 1980 and is still operating, with a 75.7% load factor in 2024.

Gravelines 3, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1975, was connected to the grid in 1980 and is still operating, with a 67.3% load factor in 2024.

Gravelines 4, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1976, was connected to the grid in 1981 and is still operating, with a 36.2% load factor in 2024.

Gravelines 5, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1979, was connected to the grid in 1984 and is still operating, with a 67.4% load factor in 2024.

Gravelines 6, a 910 MWe PWR (Framatome CP1 (CP1)), started construction in 1979, was connected to the grid in 1985 and is still operating, with a 87.5% load factor in 2024.

Operator: Electricité de France.

Owner: Electricité de France SA (Gravelines 1, Gravelines 2, Gravelines 3, Gravelines 4, Gravelines 5, Gravelines 6).