🇫🇷 France · 50.090, 4.787

Chooz

3 reactors PWR, in service since 1967. Today it delivers 3,000 MWe net, enough for about 9,450,000 households.

Operating capacity
3,000 MWe
net electrical
Units
3
2 operating
First start-up
1967
Chooz
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Chooz APressurized water (PWR)Shut down3051,040Jan 1962Apr 1967Oct 1991
Chooz B-1Pressurized water (PWR)N4 REP 1450Operating1,5004,270Jan 1, 1984Aug 30, 199665.5 % (2024)
Chooz B-2Pressurized water (PWR)N4 REP 1450Operating1,5004,270Dec 31, 1985Apr 10, 199752.7 % (2024)

Operator: Societe D'Energie Nucleaire Franco-Belge Des Ardennes (Chooz A) · Electricité De France (EDF) (Chooz B-1, Chooz B-2).

Owner: Electricité De France (EDF) (Chooz A).