China China · 29.102, 121.639

Sanmen

Sanmen, nuclear power plant in China, operates 2 pressurized water reactors with 2,314 MW net installed capacity and has been in service since 2018.

Sanmen 2-3 is under construction. Its 2,314 MW net are enough to supply about 7,290,000 households.

Country
China
Units
6
Technology
PWR
Net capacity
2,314 MWe
First grid connection
2018
Operator
Sanmen Nuclear Power
Owner
China National Nuclear Power Co Ltd
Status
Operating
Operating capacity
2,314 MWe
net electrical
Units
6
2 operating
First start-up
2018
Sanmen
Photo: Wikimedia Commons · author and license

Units

Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026

Sanmen 1-1, a 1,157 MWe PWR (AP1000), started construction in 2009, was connected to the grid in 2018 and is still operating, with a 93% load factor in 2024.

Sanmen 1-2, a 1,157 MWe PWR (AP1000), started construction in 2009, was connected to the grid in 2018 and is still operating, with a 96.6% load factor in 2024.

Sanmen 2-3, a 1,163 MWe PWR (CAP1000), has been under construction since 2022.

Sanmen 2-4, a 1,163 MWe PWR (CAP1000), has been under construction since 2023.

Sanmen 3-5, a 1,200 MWe gross PWR (Hualong One (HPR-1000)), is planned, with grid connection expected in 2027.

Sanmen 3-6, a 1,200 MWe gross PWR (Hualong One (HPR-1000)), is planned, with grid connection expected in 2028.

Operator: Sanmen Nuclear Power.

Owner: China National Nuclear Power Co Ltd (Sanmen 1-1, Sanmen 1-2, Sanmen 2-3, Sanmen 2-4, Sanmen 3-5, Sanmen 3-6).