ES
Vendor · Czech Republic

Nuclear reactors supplied by Škoda

Škoda is recorded as the nuclear steam supply system (NSSS) supplier of 13 units in 2 countries, per the IAEA PRIS register: 11 operating with 6,265 MWe net, 1 under construction and 1 shut down.

Czechoslovak maker of the VVER-440 units at Dukovany, Bohunice and Mochovce. By country: Slovakia (7) and Czech Republic (6). By technology: 12 PWR and 1 HWGCR. The first unit was connected in 1972 and the most recent in 2023. The most powerful unit in operation is Temelin 2, in the Czech Republic, with 1,029 MWe. One unit is under construction: Mochovce 4 (Slovakia). 1 unit has been permanently shut down.

Units with a Škoda nuclear steam supply system

UnitCountryTypeModelMWeGrid connectionStatus
Bohunice A1Slovakia SlovakiaHWGCRKS 150931972Shut down
Bohunice 3Slovakia SlovakiaPWRVVER-440/V-2134661984Operating
Dukovany 1Czech Republic Czech RepublicPWRVVER-440/V-2134791985Operating
Bohunice 4Slovakia SlovakiaPWRVVER-440/V-2134661985Operating
Dukovany 2Czech Republic Czech RepublicPWRVVER-440/V-2134821986Operating
Dukovany 3Czech Republic Czech RepublicPWRVVER-440/V-2134751986Operating
Dukovany 4Czech Republic Czech RepublicPWRVVER-440/V-2134711987Operating
Mochovce 1Slovakia SlovakiaPWRVVER-440 V-2134671998Operating
Mochovce 2Slovakia SlovakiaPWRVVER-440/V-2134691999Operating
Temelin 1Czech Republic Czech RepublicPWRVVER-1000/V-3201,0272000Operating
Temelin 2Czech Republic Czech RepublicPWRVVER-1000/V-3201,0292002Operating
Mochovce 3Slovakia SlovakiaPWRVVER-440/V-2134342023Operating
Mochovce 4Slovakia SlovakiaPWRVVER-440/V-213440Under construction

Data: Global Energy Monitor (CC BY 4.0), IAEA PRIS 2025, Wikipedia (CC BY-SA), Wikidata and Wikimedia Commons. Capacities in net MWe unless stated.

Other vendors