Czech Republic Czech Republic · 49.085, 16.148

Dukovany

Dukovany, nuclear power plant in Czech Republic, operates 4 pressurized water reactors with 1,916 MW net installed capacity and has been in service since 1985.

It is Czech Republic's oldest nuclear plant, operating since 1985. Unit Dukovany 1 has been operating for 41 years, since 1985. Its 1,916 MW net are enough to supply about 6,040,000 households.

Country
Czech Republic
Units
5
Technology
PWR
Net capacity
1,916 MWe
First grid connection
1985
Operator
CEZ
Owner
CEZ AS · CEZ AS [20%]; Government of Czech Republic [80%]
Status
Operating
Operating capacity
1,916 MWe
net electrical
Units
5
4 operating
First start-up
1985
Dukovany
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Dukovany 1Pressurized water (PWR)VVER-440 (V-213)Operating4791,444Jan 1, 1979Feb 24, 1985—79.3 % (2024)
Dukovany 2Pressurized water (PWR)VVER-440 (V-213)Operating4791,444Jan 1, 1979Jan 30, 1986—79.2 % (2024)
Dukovany 3Pressurized water (PWR)VVER-440 (V-213)Operating4791,444Mar 1, 1979Nov 14, 1986—78.2 % (2024)
Dukovany 4Pressurized water (PWR)VVER-440 (V-213)Operating4791,444Mar 1, 1979Jun 11, 1987—96.6 % (2024)
Dukovany 5Pressurized water (PWR)APR-1000Planned1,055——2036 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

Dukovany 1, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1985 and is still operating, with a 79.3% load factor in 2024.

Dukovany 2, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1986 and is still operating, with a 79.2% load factor in 2024.

Dukovany 3, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1986 and is still operating, with a 78.2% load factor in 2024.

Dukovany 4, a 479 MWe PWR (VVER-440 (V-213)), started construction in 1979, was connected to the grid in 1987 and is still operating, with a 96.6% load factor in 2024.

Dukovany 5, a 1,055 MWe PWR (APR-1000), is planned, with grid connection expected in 2036.

Operator: CEZ.

Owner: CEZ AS (Dukovany 1, Dukovany 2, Dukovany 3, Dukovany 4) · CEZ AS [20%]; Government of Czech Republic [80%] (Dukovany 5).