🇺🇦 Ukraine · 47.507, 34.585

Zaporizhzhia

6 reactors PWR, in service since 1985. Today it delivers 5,700 MWe net, enough for about 17,955,000 households.

Operating capacity
5,700 MWe
net electrical
Units
6
6 operating
First start-up
1985
Zaporizhzhia
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Zaporizhzhia 1Pressurized water (PWR)VVER V-320Operating9503,000Apr 1, 1980Dec 10, 198468.0 % (2021)
Zaporizhzhia 2Pressurized water (PWR)VVER V-320Operating9503,000Jan 1, 1981Jul 22, 198575.0 % (2021)
Zaporizhzhia 3Pressurized water (PWR)VVER V-320Operating9503,000Apr 1, 1982Dec 10, 198675.4 % (2021)
Zaporizhzhia 4Pressurized water (PWR)VVER V-320Operating9503,000Apr 1, 1983Dec 18, 198768.3 % (2021)
Zaporizhzhia 5Pressurized water (PWR)VVER V-320Operating9503,000Nov 1, 1985Aug 14, 198959.1 % (2021)
Zaporizhzhia 6Pressurized water (PWR)VVER V-320Operating9503,000Jun 1, 1986Oct 19, 199564.2 % (2021)

Operator: SE NNEGC "Energoatom".

More information