Russia Russia · 51.676, 35.606

Kursk

Kursk, nuclear power plant in Russia, operates 3 reactors: 2 graphite-moderated light water and 1 pressurized water with 3,050 MW net installed capacity and has been in service since 1977.

LWGR technology exists in only 2 countries worldwide. Unit Kursk 1-3 has been operating for 42 years, since 1984. Kursk 2-2 is under construction, with grid connection expected in 2028.

Country
Russia
Units
7
Technology
LWGR · PWR
Net capacity
3,050 MWe
First grid connection
1977
Operator
Rosenergoatom
Owner
Rosatom
Status
Operating
Operating capacity
3,050 MWe
net electrical
Units
7
3 operating
First start-up
1977
Kursk
Photo: Wikimedia Commons · author and license

Units

Data: IAEA PRIS · Global Energy Monitor · editorial review · updated on Sep 21, 2026

Kursk 1-1, a 925 MWe LWGR (RBMK-1000), started construction in 1972 and operated from 1976 to 2021.

Kursk 1-2, a 925 MWe LWGR (RBMK-1000), started construction in 1973 and operated from 1979 to 2024.

Kursk 1-3, a 925 MWe LWGR (RBMK-1000), started construction in 1978, was connected to the grid in 1983 and is still operating, with a 82.2% load factor in 2024.

Kursk 1-4, a 925 MWe LWGR (RBMK-1000), started construction in 1981, was connected to the grid in 1985 and is still operating, with a 85.6% load factor in 2024.

Kursk 2-1, a 1,200 MWe PWR (V-510), started construction in 2018, was connected to the grid in 2025 and is still operating.

Kursk 2-2, a 1,200 MWe PWR (V-510), has been under construction since 2019, with grid connection expected in 2028.

Kursk 2-3, a 1,200 MWe PWR (V-510), has been under construction since 2025, with grid connection expected in 2031.

Operator: Rosenergoatom.

Owner: Rosatom (Kursk 1-1, Kursk 1-2, Kursk 1-3, Kursk 1-4, Kursk 2-1, Kursk 2-2, Kursk 2-3).