Pakistan Pakistan · 24.845, 66.789

Karachi

Karachi, nuclear power plant in Pakistan, operates 2 pressurized water reactors with 2,034 MW net installed capacity and has been in service since 1972.

It is the highest-capacity nuclear plant in Pakistan. Its 2,034 MW net are enough to supply about 6,410,000 households.

Country
Pakistan
Units
3
Technology
PHWR · PWR
Net capacity
2,034 MWe
First grid connection
1972
Operator
Pakistan Atomic Energy Commission
Owner
Pakistan Atomic Energy Commission
Status
Operating
Operating capacity
2,034 MWe
net electrical
Units
3
2 operating
First start-up
1972

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Karachi 1Pressurized heavy water (PHWR · CANDU)CANDU (KANUPP) (CANDU-137 MW)Shut down90337Aug 1966Oct 1971Aug 2021—
Karachi 2Pressurized water (PWR)ACP1000Operating1,0173,060May 23, 2013Mar 18, 2021—85.4 % (2024)
Karachi 3Pressurized water (PWR)ACP1000Operating1,0173,060May 31, 2016Mar 4, 2022—68.5 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Karachi 1, a 90 MWe PHWR (CANDU (KANUPP) (CANDU-137 MW)), started construction in 1966 and operated from 1971 to 2021.

Karachi 2, a 1,017 MWe PWR (ACP1000), started construction in 2013, was connected to the grid in 2021 and is still operating, with a 85.4% load factor in 2024.

Karachi 3, a 1,017 MWe PWR (ACP1000), started construction in 2016, was connected to the grid in 2022 and is still operating, with a 68.5% load factor in 2024.

Operator: Pakistan Atomic Energy Commission.

More information

Related plants