🇯🇵 Japan · 35.522, 135.504

Takahama

4 reactors PWR, in service since 1974. Today it delivers 3,220 MWe net, enough for about 10,143,000 households.

Operating capacity
3,220 MWe
net electrical
Units
4
4 operating
First start-up
1974
Takahama
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Takahama 1Pressurized water (PWR)Mitsubishi (3-loop)Operating7802,440Apr 25, 1970Mar 27, 197476.4 % (2024)
Takahama 2Pressurized water (PWR)Mitsubishi (3-loop)Operating7802,440Mar 9, 1971Jan 17, 197588.7 % (2024)
Takahama 3Pressurized water (PWR)Mitsubishi (3-loop)Operating8302,660Dec 12, 1980May 9, 1984105.8 % (2024)
Takahama 4Pressurized water (PWR)Mitsubishi (3-loop)Operating8302,660Mar 19, 1981Nov 1, 198471.5 % (2024)

Operator: Kansai Electric Power CO.

More information