🇯🇵 Japan · 35.522, 135.504
Takahama
4 reactors PWR, in service since 1974. Today it delivers 3,220 MWe net, enough for about 10,143,000 households.
Operating capacity
3,220 MWe
net electrical
Units
4
4 operating
First start-up
1974

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Takahama 1 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 780 | 2,440 | Apr 25, 1970 | Mar 27, 1974 | — | 76.4 % (2024) |
| Takahama 2 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 780 | 2,440 | Mar 9, 1971 | Jan 17, 1975 | — | 88.7 % (2024) |
| Takahama 3 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 830 | 2,660 | Dec 12, 1980 | May 9, 1984 | — | 105.8 % (2024) |
| Takahama 4 | Pressurized water (PWR) | Mitsubishi (3-loop) | Operating | 830 | 2,660 | Mar 19, 1981 | Nov 1, 1984 | — | 71.5 % (2024) |
Operator: Kansai Electric Power CO.