4 reactors PWR, in service since 1975. Today it delivers 2,254 MWe net, enough for about 7,100,100 households.
Operating capacity
2,254 MWe
net electrical
Units
4
2 operating
First start-up
1975

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Genkai 1 | Pressurized water (PWR) | Mitsubishi (2-loop) | Shut down | 529 | 1,650 | Sep 1971 | Feb 1975 | Apr 2015 | — |
| Genkai 2 | Pressurized water (PWR) | Mitsubishi (2-loop) | Shut down | 529 | 1,650 | Feb 1977 | Jun 1980 | Apr 2019 | — |
| Genkai 3 | Pressurized water (PWR) | Mitsubishi (4-loop) | Operating | 1,127 | 3,423 | Jun 1, 1988 | Jun 15, 1993 | — | 93.1 % (2024) |
| Genkai 4 | Pressurized water (PWR) | Mitsubishi (4-loop) | Operating | 1,127 | 3,423 | Jul 15, 1992 | Nov 12, 1996 | — | 82.2 % (2024) |
Operator: Kyushu Electric Power CO INC.