🇯🇵 Japan · 33.515, 129.836

Genkai

4 reactors PWR, in service since 1975. Today it delivers 2,254 MWe net, enough for about 7,100,100 households.

Operating capacity
2,254 MWe
net electrical
Units
4
2 operating
First start-up
1975
Genkai
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Genkai 1Pressurized water (PWR)Mitsubishi (2-loop)Shut down5291,650Sep 1971Feb 1975Apr 2015
Genkai 2Pressurized water (PWR)Mitsubishi (2-loop)Shut down5291,650Feb 1977Jun 1980Apr 2019
Genkai 3Pressurized water (PWR)Mitsubishi (4-loop)Operating1,1273,423Jun 1, 1988Jun 15, 199393.1 % (2024)
Genkai 4Pressurized water (PWR)Mitsubishi (4-loop)Operating1,1273,423Jul 15, 1992Nov 12, 199682.2 % (2024)

Operator: Kyushu Electric Power CO INC.

More information