Ohi, nuclear power plant in Japan, operates 2 pressurized water reactors with 2,254 MW net installed capacity and has been in service since 1979.

Unit Ohi 3 has been operating for 35 years, since 1991. Its 2,254 MW net are enough to supply about 7,100,000 households.

Country
Japan
Units
4
Technology
PWR
Net capacity
2,254 MWe
First grid connection
1979
Operator
Kansai Electric Power
Owner
Kansai Electric Power Co
Status
Operating
Operating capacity
2,254 MWe
net electrical
Units
4
2 operating
First start-up
1979
Ohi
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Ohi 1Pressurized water (PWR)Westinghouse 4-loop (WH 4LP)Shut down1,1203,423Oct 1972Dec 1977Mar 2018—
Ohi 2Pressurized water (PWR)Westinghouse 4-loop (WH 4LP)Shut down1,1203,423Dec 1972Oct 1978Mar 2018—
Ohi 3Pressurized water (PWR)Mitsubishi 4-loop (M 4LP)Operating1,1273,423Oct 3, 1987Jun 7, 1991—86.2 % (2024)
Ohi 4Pressurized water (PWR)Mitsubishi 4-loop (M 4LP)Operating1,1273,423Jun 13, 1988Jun 19, 1992—97.8 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Ohi 1, a 1,120 MWe PWR (Westinghouse 4-loop (WH 4LP)), started construction in 1972 and operated from 1977 to 2018.

Ohi 2, a 1,120 MWe PWR (Westinghouse 4-loop (WH 4LP)), started construction in 1972 and operated from 1978 to 2018.

Ohi 3, a 1,127 MWe PWR (Mitsubishi 4-loop (M 4LP)), started construction in 1987, was connected to the grid in 1991 and is still operating, with a 86.2% load factor in 2024.

Ohi 4, a 1,127 MWe PWR (Mitsubishi 4-loop (M 4LP)), started construction in 1988, was connected to the grid in 1992 and is still operating, with a 97.8% load factor in 2024.