Japan Japan · 33.515, 129.836

Genkai

Genkai, nuclear power plant in Japan, operates 2 pressurized water reactors with 2,254 MW net installed capacity and has been in service since 1975.

Unit Genkai 3 has been operating for 32 years, since 1994. Its 2,254 MW net are enough to supply about 7,100,000 households.

Country
Japan
Units
4
Technology
PWR
Net capacity
2,254 MWe
First grid connection
1975
Operator
Kyushu Electric Power
Owner
Kyushu Electric Power Co Inc
Status
Operating
Operating capacity
2,254 MWe
net electrical
Units
4
2 operating
First start-up
1975
Genkai
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Genkai 1Pressurized water (PWR)Mitsubishi 2-loop (M 2LP)Shut down5291,650Sep 1971Feb 1975Apr 2015—
Genkai 2Pressurized water (PWR)Mitsubishi 2-loop (M 2LP)Shut down5291,650Feb 1977Jun 1980Apr 2019—
Genkai 3Pressurized water (PWR)Mitsubishi 4-loop (M 4LP)Operating1,1273,423Jun 1, 1988Jun 15, 1993—93.1 % (2024)
Genkai 4Pressurized water (PWR)Mitsubishi 4-loop (M 4LP)Operating1,1273,423Jul 15, 1992Nov 12, 1996—82.2 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Genkai 1, a 529 MWe PWR (Mitsubishi 2-loop (M 2LP)), started construction in 1971 and operated from 1975 to 2015.

Genkai 2, a 529 MWe PWR (Mitsubishi 2-loop (M 2LP)), started construction in 1977 and operated from 1980 to 2019.

Genkai 3, a 1,127 MWe PWR (Mitsubishi 4-loop (M 4LP)), started construction in 1988, was connected to the grid in 1993 and is still operating, with a 93.1% load factor in 2024.

Genkai 4, a 1,127 MWe PWR (Mitsubishi 4-loop (M 4LP)), started construction in 1992, was connected to the grid in 1996 and is still operating, with a 82.2% load factor in 2024.

Operator: Kyushu Electric Power.

Owner: Kyushu Electric Power Co Inc (Genkai 1, Genkai 2, Genkai 3, Genkai 4).