🇮🇳 India · 21.238, 73.349
Kakrapar
4 reactors PHWR, in service since 1993. Today it delivers 1,664 MWe net, enough for about 5,241,600 households.
Operating capacity
1,664 MWe
net electrical
Units
4
4 operating
First start-up
1993

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Kakrapar 1 | Pressurized heavy water (PHWR · CANDU) | {{yes|Operational}} | Operating | 202 | 801 | May 6, 1993 | Nov 24, 1992 | — | 86.0 % (2024) |
| Kakrapar 2 | Pressurized heavy water (PHWR · CANDU) | Horizontal | Operating | 202 | 801 | Apr 1, 1985 | Mar 4, 1995 | — | 96.8 % (2024) |
| Kakrapar 3 | Pressurized heavy water (PHWR · CANDU) | {{yes|Operational}} | Operating | 630 | 2,166 | Nov 22, 2010 | Jan 10, 2021 | — | 65.1 % (2024) |
| Kakrapar 4 | Pressurized heavy water (PHWR · CANDU) | PHWR-700 | Operating | 630 | 2,166 | Nov 22, 2010 | Feb 20, 2024 | — | 71.9 % (2024) |
Operator: Nuclear Power Corporation Of India LTD.