France France · 49.976, 1.211

Penly

Penly, nuclear power plant in France, operates 2 pressurized water reactors with 2,660 MW net installed capacity and has been in service since 1990.

Unit Penly 1 has been operating for 36 years, since 1990. Its 2,660 MW net are enough to supply about 8,380,000 households.

Country
France
Units
4
Technology
PWR
Net capacity
2,660 MWe
First grid connection
1990
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
2,660 MWe
net electrical
Units
4
2 operating
First start-up
1990
Penly
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Penly 1Pressurized water (PWR)P4 REP 1300Operating1,3303,817Sep 1, 1982May 4, 1990—68.2 % (2024)
Penly 2Pressurized water (PWR)P4 REP 1300Operating1,3303,817Aug 1, 1984Feb 4, 1992—68.0 % (2024)
Penly 3Pressurized water (PWR)EPR2Planned1,670—20242038 (planned)——
Penly 4Pressurized water (PWR)EPR2Planned1,670—20242038 (planned)——

Data: IAEA PRIS · Global Energy Monitor · Wikipedia · updated on Sep 17, 2026

Penly 1, a 1,330 MWe PWR (P4 REP 1300), started construction in 1982, was connected to the grid in 1990 and is still operating, with a 68.2% load factor in 2024.

Penly 2, a 1,330 MWe PWR (P4 REP 1300), started construction in 1984, was connected to the grid in 1992 and is still operating, with a 68% load factor in 2024.

Penly 3, a 1,670 MWe PWR (EPR2), is planned, with grid connection expected in 2038.

Penly 4, a 1,670 MWe PWR (EPR2), is planned, with grid connection expected in 2038.

Operator: Electricité de France.

Owner: Electricité de France SA (Penly 1, Penly 2, Penly 3, Penly 4).