France France · 44.633, 4.755

Cruas

Cruas, nuclear power plant in France, operates 4 pressurized water reactors with 3,660 MW net installed capacity and has been in service since 1984.

Unit Cruas 3 has been operating for 42 years, since 1984. Its 3,660 MW net are enough to supply about 11,500,000 households.

Country
France
Units
4
Technology
PWR
Net capacity
3,660 MWe
First grid connection
1984
Operator
Electricité de France
Owner
Electricité de France SA
Status
Operating
Operating capacity
3,660 MWe
net electrical
Units
4
4 operating
First start-up
1984
Cruas
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Cruas 1Pressurized water (PWR)CP2Operating9152,785Aug 1, 1978Apr 29, 1983—86.2 % (2024)
Cruas 2Pressurized water (PWR)CP2Operating9152,785Nov 15, 1978Sep 6, 1984—75.8 % (2024)
Cruas 3Pressurized water (PWR)CP2Operating9152,785Apr 15, 1979May 14, 1984—56.3 % (2024)
Cruas 4Pressurized water (PWR)CP2Operating9152,785Oct 1, 1979Oct 27, 1984—65.8 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Cruas 1, a 915 MWe PWR (CP2), started construction in 1978, was connected to the grid in 1983 and is still operating, with a 86.2% load factor in 2024.

Cruas 2, a 915 MWe PWR (CP2), started construction in 1978, was connected to the grid in 1984 and is still operating, with a 75.8% load factor in 2024.

Cruas 3, a 915 MWe PWR (CP2), started construction in 1979, was connected to the grid in 1984 and is still operating, with a 56.3% load factor in 2024.

Cruas 4, a 915 MWe PWR (CP2), started construction in 1979, was connected to the grid in 1984 and is still operating, with a 65.8% load factor in 2024.

Operator: Electricité de France.

Owner: Electricité de France SA (Cruas 1, Cruas 2, Cruas 3, Cruas 4).

More information

Related plants