Haiyang
Haiyang, nuclear power plant in China, operates 2 pressurized water reactors with 2,340 MW net installed capacity and has been in service since 2018.
Haiyang 2-3 is under construction, with grid connection expected in 2027. Its 2,340 MW net are enough to supply about 7,370,000 households.
- Country
- China
- Units
- 5
- Technology
- PWR
- Net capacity
- 2,340 MWe
- First grid connection
- 2018
- Operator
- Shandong Nuclear Power
- Owner
- State Power Investment Nuclear Energy Co Ltd
- Status
- Operating
See also: alerts for this plant · every plant in China · Vendor: Westinghouse · Vendor: CNNC · every PWR reactor · how a PWR works

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Haiyang 1-1 | Pressurized water (PWR) | AP1000 | Operating | 1,170 | 3,415 | Sep 24, 2009 | Aug 17, 2018 | — | 95.3 % (2024) |
| Haiyang 1-2 | Pressurized water (PWR) | AP1000 | Operating | 1,170 | 3,415 | Jun 20, 2010 | Oct 13, 2018 | — | 90.6 % (2024) |
| Haiyang 2-3 | Pressurized water (PWR) | CAP1000 | Under construction | 1,161 | 3,400 | Jul 2022 | 2027 (planned) | — | — |
| Haiyang 2-4 | Pressurized water (PWR) | CAP1000 | Under construction | 1,161 | 3,400 | Apr 2023 | 2027 (planned) | — | — |
| Haiyang 3-5 | Pressurized water (PWR) | CAP1000 | Planned | 1,250 | — | — | 2028 (planned) | — | — |
Data: IAEA PRIS · Global Energy Monitor · updated on Aug 1, 2026
Haiyang 1-1, a 1,170 MWe PWR (AP1000), started construction in 2009, was connected to the grid in 2018 and is still operating, with a 95.3% load factor in 2024.
Haiyang 1-2, a 1,170 MWe PWR (AP1000), started construction in 2010, was connected to the grid in 2018 and is still operating, with a 90.6% load factor in 2024.
Haiyang 2-3, a 1,161 MWe PWR (CAP1000), has been under construction since 2022, with grid connection expected in 2027.
Haiyang 2-4, a 1,161 MWe PWR (CAP1000), has been under construction since 2023, with grid connection expected in 2027.
Haiyang 3-5, a 1,250 MWe gross PWR (CAP1000), is planned, with grid connection expected in 2028.
Operator: Shandong Nuclear Power.
Owner: State Power Investment Nuclear Energy Co Ltd (Haiyang 1-1, Haiyang 1-2, Haiyang 2-3, Haiyang 2-4, Haiyang 3-5).