Canada Canada · 46.395, -72.358

Gentilly

Gentilly, nuclear power plant in Canada, operated 2 reactors: 1 heavy water light water and 1 pressurized heavy water between 1972 and 2012 and is now shut down.

Country
Canada
Units
2
Technology
HWLWR · PHWR
Net capacity
—
First grid connection
1972
Operator
Hydro Quebec
Owner
Canadian Nuclear Laboratories Ltd · Hydro Quebec
Status
Shut down
Operating capacity
0 MWe
net electrical
Units
2
0 operating
First start-up
1972
Gentilly
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Gentilly 1Heavy water light water (HWLWR)CANDU-BLW-250 (HW BLWR 250)Shut down250792Sep 1966Apr 1971Jun 1, 1977—
Gentilly 2Pressurized heavy water (PHWR · CANDU)CANDU 6Shut down6352,156Apr 1974Dec 1982Dec 2012—

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Gentilly 1, a 250 MWe HWLWR (CANDU-BLW-250 (HW BLWR 250)), started construction in 1966 and operated from 1971 to 1977.

Gentilly 2, a 635 MWe PHWR (CANDU 6), started construction in 1974 and operated from 1982 to 2012.

Operator: Hydro Quebec.

Owner: Canadian Nuclear Laboratories Ltd (Gentilly 1).