🇧🇪 Belgium · 51.325, 4.260

Doel

4 reactors PWR, in service since 1975. Today it delivers 1,916 MWe net, enough for about 6,035,400 households.

Operating capacity
1,916 MWe
net electrical
Units
4
3 operating
First start-up
1975
Doel
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Doel 1Pressurized water (PWR)WH 2 loopsOperating4451,311Jul 1, 1969Aug 28, 1974202593.2 % (2024)
Doel 2Pressurized water (PWR)WH 2 loopsOperating4451,311Sep 1, 1971Aug 21, 1975202588.9 % (2024)
Doel 3Pressurized water (PWR)Framatome 3 loopsShut down1,0063,054Jan 1975Jun 1982Sep 2022
Doel 4Pressurized water (PWR)Belgian firms plus WH 3 loopsOperating1,0262,988Dec 1, 1978Apr 8, 19852035 (planned)72.0 % (2024)

Operator: Engie Electrabel; EDF Belgium; EDF Luminus.

Owner: Indivision Doel (Doel 1, Doel 2) · Societes Reunies D'Energie Du Bassin De L'Escaut SA (Doel 3, Doel 4).

More information