🇧🇪 Belgium · 51.325, 4.260
Doel
4 reactors PWR, in service since 1975. Today it delivers 1,916 MWe net, enough for about 6,035,400 households.
Operating capacity
1,916 MWe
net electrical
Units
4
3 operating
First start-up
1975

Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Doel 1 | Pressurized water (PWR) | WH 2 loops | Operating | 445 | 1,311 | Jul 1, 1969 | Aug 28, 1974 | 2025 | 93.2 % (2024) |
| Doel 2 | Pressurized water (PWR) | WH 2 loops | Operating | 445 | 1,311 | Sep 1, 1971 | Aug 21, 1975 | 2025 | 88.9 % (2024) |
| Doel 3 | Pressurized water (PWR) | Framatome 3 loops | Shut down | 1,006 | 3,054 | Jan 1975 | Jun 1982 | Sep 2022 | — |
| Doel 4 | Pressurized water (PWR) | Belgian firms plus WH 3 loops | Operating | 1,026 | 2,988 | Dec 1, 1978 | Apr 8, 1985 | 2035 (planned) | 72.0 % (2024) |
Operator: Engie Electrabel; EDF Belgium; EDF Luminus.
Owner: Indivision Doel (Doel 1, Doel 2) · Societes Reunies D'Energie Du Bassin De L'Escaut SA (Doel 3, Doel 4).