Belgium Belgium · 51.325, 4.260

Doel

Doel, nuclear power plant in Belgium, operates one pressurized water reactor with 1,026 MW net installed capacity and has been in service since 1975.

Unit Doel 4 has been operating for 41 years, since 1985. Its 1,026 MW net are enough to supply about 3,230,000 households.

Country
Belgium
Units
4
Technology
PWR
Net capacity
1,026 MWe
First grid connection
1975
Operator
Engie Electrabel; EDF Belgium; EDF Luminus
Owner
Indivision Doel · Societes Reunies D'Energie Du Bassin De L'Escaut SA
Status
Operating
Operating capacity
1,026 MWe
net electrical
Units
4
1 operating
First start-up
1975
Doel
Photo: Wikimedia Commons · author and license

Units

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Doel 1, a 445 MWe PWR (Westinghouse 2-loop (WH 2LP)), started construction in 1969 and operated from 1974 to 2025.

Doel 2, a 445 MWe PWR (Westinghouse 2-loop (WH 2LP)), started construction in 1971 and operated from 1975 to 2025.

Doel 3, a 1,006 MWe PWR (Westinghouse 3-loop (WH 3LP)), started construction in 1975 and operated from 1982 to 2022.

Doel 4, a 1,026 MWe PWR (Westinghouse 3-loop (WH 3LP)), started construction in 1978, was connected to the grid in 1985 and is still operating, with a 72% load factor in 2024.

Operator: Engie Electrabel; EDF Belgium; EDF Luminus.

Owner: Indivision Doel (Doel 1, Doel 2) · Societes Reunies D'Energie Du Bassin De L'Escaut SA (Doel 3, Doel 4).