🇦🇷 Argentina · -33.967, -59.209

Atucha

4 reactors PHWR · PWR, in service since 1974. Today it delivers 1,058 MWe net, enough for about 3,332,700 households.

Operating capacity
1,058 MWe
net electrical
Units
4
3 operating
First start-up
1974
Atucha
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Atucha 1Pressurized heavy water (PHWR · Siemens-KWU)Siemens-KWUOperating3401,179May 31, 1968Mar 19, 197468.8 % (2024)
Atucha 2Pressurized heavy water (PHWR · Siemens-KWU)Siemens-KWUOperating6932,160Jul 13, 1981Jun 27, 201467.5 % (2024)
Atucha 3Pressurized water (PWR)Hualong OnePlanned1,150
CAREMPressurized water (PWR)CAREM PrototypOperation suspended25100Aug 2015

Operator: Nucleoelectrica Argentina SA (Atucha 1, Atucha 2, Atucha 3) · Comision Nacional De Energia Atomica (CAREM).

Owner: China National Nuclear CORP [85%]; Nucleoelectrica Argentina SA [15%] (Atucha 3).

More information