United Arab Emirates United Arab Emirates · 23.970, 52.236

Barakah

Barakah, nuclear power plant in United Arab Emirates, operates 4 pressurized water reactors with 5,348 MW net installed capacity and has been in service since 2021.

Its 5,348 MW net are enough to supply about 16,800,000 households.

Country
United Arab Emirates
Units
4
Technology
PWR
Net capacity
5,348 MWe
First grid connection
2021
Operator
Nawah Energy
Owner
Emirates Nuclear Energy Corp
Status
Operating
Operating capacity
5,348 MWe
net electrical
Units
4
4 operating
First start-up
2021
Barakah
Photo: Wikimedia Commons · author and license

Units

UnitTypeModelStatusMWeMWtConstruction startGrid connectionClosureLoad factor
Barakah 1Pressurized water (PWR)APR-1400Operating1,3373,983Jul 19, 2012Aug 19, 2020—96.2 % (2024)
Barakah 2Pressurized water (PWR)APR-1400Operating1,3373,983Apr 15, 2013Sep 14, 2021—85.2 % (2024)
Barakah 3Pressurized water (PWR)APR-1400Operating1,3373,983Sep 24, 2014Oct 8, 2022—85.9 % (2024)
Barakah 4Pressurized water (PWR)APR-1400Operating1,3373,983Jul 30, 2015Mar 23, 2024—83.7 % (2024)

Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026

Barakah 1, a 1,337 MWe PWR (APR-1400), started construction in 2012, was connected to the grid in 2020 and is still operating, with a 96.2% load factor in 2024.

Barakah 2, a 1,337 MWe PWR (APR-1400), started construction in 2013, was connected to the grid in 2021 and is still operating, with a 85.2% load factor in 2024.

Barakah 3, a 1,337 MWe PWR (APR-1400), started construction in 2014, was connected to the grid in 2022 and is still operating, with a 85.9% load factor in 2024.

Barakah 4, a 1,337 MWe PWR (APR-1400), started construction in 2015, was connected to the grid in 2024 and is still operating, with a 83.7% load factor in 2024.

Operator: Nawah Energy.

Owner: Emirates Nuclear Energy Corp (Barakah 1, Barakah 2, Barakah 3, Barakah 4).