Fukushima Daini
Fukushima Daini, nuclear power plant in Japan, operated 4 boiling water reactors between 1982 and 2019 and is now shut down.
- Country
- Japan
- Units
- 4
- Technology
- BWR
- Net capacity
- —
- First grid connection
- 1982
- Operator
- Tokyo Electric Power
- Owner
- Tokyo Electric Power Co
- Status
- Shut down
See also: alerts for this plant · every plant in Japan · Vendor: Toshiba · Vendor: Hitachi · every BWR reactor · how a BWR works
Units
| Unit | Type | Model | Status | MWe | MWt | Construction start | Grid connection | Closure | Load factor |
|---|---|---|---|---|---|---|---|---|---|
| Fukushima Daini 1 | Boiling water (BWR) | BWR-5 | Shut down | 1,067 | 3,293 | Mar 1976 | Jul 1981 | Sep 2019 | — |
| Fukushima Daini 2 | Boiling water (BWR) | BWR-5 | Shut down | 1,067 | 3,293 | May 25, 1979 | Jun 1983 | Sep 2019 | — |
| Fukushima Daini 3 | Boiling water (BWR) | BWR-5 | Shut down | 1,067 | 3,293 | Mar 1981 | Dec 1984 | Sep 2019 | — |
| Fukushima Daini 4 | Boiling water (BWR) | BWR-5 | Shut down | 1,067 | 3,293 | May 28, 1981 | Dec 1986 | Sep 2019 | — |
Data: IAEA PRIS · Wikipedia · updated on Sep 17, 2026
Fukushima Daini 1, a 1,067 MWe BWR (BWR-5), started construction in 1976 and operated from 1981 to 2019.
Fukushima Daini 2, a 1,067 MWe BWR (BWR-5), started construction in 1979 and operated from 1983 to 2019.
Fukushima Daini 3, a 1,067 MWe BWR (BWR-5), started construction in 1981 and operated from 1984 to 2019.
Fukushima Daini 4, a 1,067 MWe BWR (BWR-5), started construction in 1981 and operated from 1986 to 2019.
Operator: Tokyo Electric Power.
Owner: Tokyo Electric Power Co (Fukushima Daini 1, Fukushima Daini 2, Fukushima Daini 3, Fukushima Daini 4).